Differences between revisions 5 and 8 (spanning 3 versions)
Revision 5 as of 2017-06-12 11:35:37
Size: 1373
Comment:
Revision 8 as of 2017-07-20 10:10:41
Size: 1367
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
|| 4月 || Main path || || || || 設計 || || ||
|| 5月 ||FSS install, PMC製作 || || || 治具設計 || 製作 || || ||
|| 6月 || || AOM install ||Initial Alignement|| 治具製作、鏡取り出し、接着 ||製作 || || Pickoff ||
|| 7月 ||PMC install || || || 鏡installation, integration || 製作 || || ||
|| 8月 || || || Lock || Beam profile || 製作 || || ||
|| 9月 || || ISS || WFS || || || || ||
|| 4月 || Main path || || || || Design || || ||
|| 5月 ||FSS install, PMC manufacture || || || Jig design || Manufacture || || ||
|| 6月 || || ||Initial Alignement|| Jig manufacture, glue ||Manufacture || || Pickoff ||
|| 7月 || Beam split || || WFS-II || Mirr installation, integration || Manufacture || || ||
|| 8月 || PMC install || AOM install (after PMC) || Lock || Beam profile || Manufacture || || ||
|| 9月 || || ISS || WFS-III || || || || ||

Schedule Overview

Fiscal 2017

PSL

ISS

IMC

IMMT

Tilt

OMC

Green

4月

Main path

Design

5月

FSS install, PMC manufacture

Jig design

Manufacture

6月

Initial Alignement

Jig manufacture, glue

Manufacture

Pickoff

7月

Beam split

WFS-II

Mirr installation, integration

Manufacture

8月

PMC install

AOM install (after PMC)

Lock

Beam profile

Manufacture

9月

ISS

WFS-III

10月

Installation

Installation

11月

12月

1月

2月

3月

KAGRA/Subgroups/IOO/scheduleOverview (last edited 2017-08-22 10:13:07 by KeikoKokeyama)