Schedule Overview
Fiscal 2017
|
PSL |
ISS |
IMC |
IMMT |
Tilt |
OMC |
Green |
4月 |
Main path |
|
|
|
Design |
|
|
5月 |
FSS install, PMC manufacture |
|
|
Jig design |
Manufacture |
|
|
6月 |
|
|
Initial Alignement |
Jig manufacture, glue |
Manufacture |
|
Pickoff |
7月 |
Beam split |
|
WFS-II |
Mirr installation, integration |
Manufacture |
|
|
8月 |
PMC install |
AOM install (after PMC) |
Lock |
Beam profile, Oplevs, Dampers |
Manufacture |
|
|
9月 |
|
ISS & AOM |
WFS-III |
|
|
|
|
10月 |
|
|
|
|
Installation |
|
Installation |
11月 |
|
|
|
|
|
|
|
12月 |
|
|
|
|
|
|
|
1月 |
|
|
|
|
|
|
|
2月 |
|
|
|
|
|
|
|
3月 |
|
|
|
|
|
|
|