Differences between revisions 7 and 10 (spanning 3 versions)
Revision 7 as of 2017-06-15 11:16:17
Size: 1370
Comment:
Revision 10 as of 2017-08-22 10:13:07
Size: 1396
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
|| 7月 ||PMC install || AOM install (after PMC) || || Mirr installation, integration || Manufacture || || ||
|| 8月 || || || Lock || Beam profile || Manufacture || || ||
|| 9月 || || ISS || WFS || || || || ||
|| 7月 || Beam split || || WFS-II || Mirr installation, integration || Manufacture || || ||
|| 8月 || PMC install || --(AOM install (after PMC) )-- || Lock || Beam profile, Oplevs, Dampers || Manufacture || || ||
|| 9月 || || ISS & AOM || WFS-III || || || || ||

Schedule Overview

Fiscal 2017

PSL

ISS

IMC

IMMT

Tilt

OMC

Green

4月

Main path

Design

5月

FSS install, PMC manufacture

Jig design

Manufacture

6月

Initial Alignement

Jig manufacture, glue

Manufacture

Pickoff

7月

Beam split

WFS-II

Mirr installation, integration

Manufacture

8月

PMC install

AOM install (after PMC)

Lock

Beam profile, Oplevs, Dampers

Manufacture

9月

ISS & AOM

WFS-III

10月

Installation

Installation

11月

12月

1月

2月

3月

KAGRA/Subgroups/IOO/scheduleOverview (last edited 2017-08-22 10:13:07 by KeikoKokeyama)