== Schedule Overview == === Fiscal 2017 === || || PSL || ISS || IMC || IMMT || Tilt || OMC || Green || || 4月 || Main path || || || || Design || || || || 5月 ||FSS install, PMC manufacture || || || Jig design || Manufacture || || || || 6月 || || ||Initial Alignement|| Jig manufacture, glue ||Manufacture || || Pickoff || || 7月 || Beam split || || WFS-II || Mirr installation, integration || Manufacture || || || || 8月 || PMC install || --(AOM install (after PMC) )-- || Lock || Beam profile, Oplevs, Dampers || Manufacture || || || || 9月 || || ISS & AOM || WFS-III || || || || || || 10月 || || || || || Installation || || Installation || || 11月 || || || || || || || || || 12月 || || || || || || || || || 1月 || || || || || || || || || 2月 || || || || || || || || || 3月 || || || || || || || ||