== Plan ==
 * Test fabrication of RF PD (by the end of September ?, test in October)
 * Compile other analog circuit designs from LIGO into KAGRA spec. (by the end of October)
 * Design frequency stabilization related circuits with NAOJ group (by the end of FY2012)

Analog Electronics for Interferometer Control

Plan

  • Test fabrication of RF PD (by the end of September ?, test in October)
  • Compile other analog circuit designs from LIGO into KAGRA spec. (by the end of October)
  • Design frequency stabilization related circuits with NAOJ group (by the end of FY2012)