Analog Electronics for Interferometer Control
Plan
- Test fabrication of RF PD (by the end of September ?, test in October)
- Compile other analog circuit designs from LIGO into KAGRA spec. (by the end of October)
- Design frequency stabilization related circuits with NAOJ group (by the end of FY2012)