Size: 364
Comment:
|
Size: 641
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
== Plan == | == Electronics == || Name || Height || Schematics || aLIGO link || Description || == For each rack == * KAGRA ISC Electrical Components Layout [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=2986|JGW-D1402986]] === IO rack === ---- == Plan (as of 2012-08) == |
Analog Electronics for Interferometer Control
Electronics
Name |
Height |
Schematics |
aLIGO link |
Description |
For each rack
* KAGRA ISC Electrical Components Layout JGW-D1402986
IO rack
Plan (as of 2012-08)
- Test fabrication of RF PD (by the end of September ?, test in October)
- Compile other analog circuit designs from LIGO into KAGRA spec. (by the end of October)
- Design frequency stabilization related circuits with NAOJ group (by the end of FY2012)