Differences between revisions 4 and 5
Revision 4 as of 2014-11-13 15:11:40
Size: 434
Comment:
Revision 5 as of 2014-11-13 15:14:11
Size: 512
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
|| Name || Height || Schematics || aLIGO link || Description ||
Line 7: Line 7:
=== IO rack ===

Analog Electronics for Interferometer Control

Electronics

Name

Height

Schematics

aLIGO link

Description

For each rack

IO rack


Plan (as of 2012-08)

  • Test fabrication of RF PD (by the end of September ?, test in October)
  • Compile other analog circuit designs from LIGO into KAGRA spec. (by the end of October)
  • Design frequency stabilization related circuits with NAOJ group (by the end of FY2012)

RFPD

KAGRA/Subgroups/MIF/AEL (last edited 2024-05-15 13:09:12 by satoru.takano)