= This page is under construction (Aso) = = iKAGRA PR3 alignment & Beam Profile Measurements = Date: 2016/3/4 Workers: Aso,Michimura,Ushiba,Kuwahara,Okutomi,Kambara === Objectives === * Center the beams on BS * Measure the beam profile in front of BS and inside IXA * Adjust the position of PR2 === Procedure === * Enter the tunnel, check necessary tools === Necessary items, tools === * Large size beam profiler (Doi-san's room) * A height adjustable table (Found two of them near the PR3 on +Y side) * Two PHS phones for communication between PR and BS area clean booths (or transceivers) * Two sets of floor KOACH * Clean suits and inner ware * Chamber compatible type * Found many L and M in the laser room. For other size, we need to bring them from the data analysis building. === Items to be brought into the tunnel === * PHS (2) === Notes ===