Differences between revisions 1 and 4 (spanning 3 versions)
Revision 1 as of 2021-07-14 13:26:42
Size: 277
Comment:
Revision 4 as of 2021-07-14 13:54:51
Size: 963
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
External Review for interferometer alignment controls (August 2021) = External Review for interferometer alignment controls (August 2021) =
Line 3: Line 3:
= Purpose = == Purpose ==
Line 5: Line 5:
= Topics = == Agenda ==
 1. Daily alignment of the interferometer (summary of O3-RSE trial situation and improvement plans)
 1. Commissioning and simulations for alignment sensing and control (summary of current situation and plans)
 1. Input mode cleaner alignment sensing and control report (report from the site works)
Line 7: Line 10:
= Daily alignment of the interferometer = == 1. Daily alignment of the interferometer ==
Line 9: Line 12:
= Commissioning and simulations for alignment sensing and control = === Summary of the current status ===
Line 11: Line 14:
= Input mode cleaner alignment sensing and control report = === Known issues and our plans (highly uncertain) ===

 * Issue 1
  * Plans ...
 * Issue 2
  * Plans ...

=== Known issues and our plans (less uncertain) ===

== 2. Commissioning and simulations for alignment sensing and control ==

=== Summary of the current status ===

=== Known issues and our plans (highly uncertain) ===

=== Known issues and our plans (less uncertain) ===

== 3. Input mode cleaner alignment sensing and control report ==

External Review for interferometer alignment controls (August 2021)

Purpose

Agenda

  1. Daily alignment of the interferometer (summary of O3-RSE trial situation and improvement plans)
  2. Commissioning and simulations for alignment sensing and control (summary of current situation and plans)
  3. Input mode cleaner alignment sensing and control report (report from the site works)

1. Daily alignment of the interferometer

Summary of the current status

Known issues and our plans (highly uncertain)

  • Issue 1
    • Plans ...
  • Issue 2
    • Plans ...

Known issues and our plans (less uncertain)

2. Commissioning and simulations for alignment sensing and control

Summary of the current status

Known issues and our plans (highly uncertain)

Known issues and our plans (less uncertain)

3. Input mode cleaner alignment sensing and control report

KAGRA/Subgroups/MIF/ExternalReview2021 (last edited 2021-08-26 00:30:15 by haoyu.wang)