Size: 592
Comment:
|
Size: 601
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
== Daily alignment of the interferometer == | == 1. Daily alignment of the interferometer == |
Line 12: | Line 12: |
== Commissioning and simulations for alignment sensing and control == | == 2. Commissioning and simulations for alignment sensing and control == |
Line 14: | Line 14: |
== Input mode cleaner alignment sensing and control report == | == 3. Input mode cleaner alignment sensing and control report == |
External Review for interferometer alignment controls (August 2021)
Purpose
Agenda
- Daily alignment of the interferometer (summary of O3-RSE trial situation and improvement plans)
- Commissioning and simulations for alignment sensing and control (summary of current situation and plans)
- Input mode cleaner alignment sensing and control report (report from the site works)
1. Daily alignment of the interferometer
2. Commissioning and simulations for alignment sensing and control