O4 Commissioning Task List
This is a list of things to do for each commissioning stage for O4.
Each stage include ASC.
References
klog review during O3 commissioining JGW-E2112729
Preparations
- Tune f1, f2, f3 frequencies to IMC FSR
Replace all the in-vac steering mirrors and pick-off mirrors to proper ones JGW-T2112592
Replace all the beam splitters in in-air optical tables to non-polarizing beam splitters JGW-D2112956
- This is necessary to estimate the polarization content of the interferometer correctly (without too much confusion)
- Install polarization optics to backward POP or POS, and TRY and TRY.
This is necessary to estimate the arm cavity round-trip loss correctly JGW-T2011633
Xarm
Yarm
Michelson
FPMI