== Plan ==

 * Get a realistic suspension model with local damping (by the end of August ?)
 * Work out the overall servo topology of LSC/ASC (by the end of September)
 * Create frequency domain LSC/ASC simulation model (by the end of October)
 * Implement the model with RTS (simulated plant) (by the end of March 2013)

LSC/ASC Overall Design

Plan

  • Get a realistic suspension model with local damping (by the end of August ?)
  • Work out the overall servo topology of LSC/ASC (by the end of September)
  • Create frequency domain LSC/ASC simulation model (by the end of October)
  • Implement the model with RTS (simulated plant) (by the end of March 2013)