Differences between revisions 26 and 34 (spanning 8 versions)
Revision 26 as of 2012-08-23 13:24:33
Size: 3432
Editor: YoichiAso
Comment:
Revision 34 as of 2018-01-18 16:03:52
Size: 2728
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Instrument Control Working Group = ## page was renamed from InstrumentControl
= PLC (Instrument Control) Working Group =
||<tablewidth="376px" tableheight="86px">[[#Scope|Scope]] ||Documents ||EPICS ||
||Center ||X-End ||Y-End ||
|| || || ||


<<Anchor(Scope)>>
Line 9: Line 17:
== Requirements == <<Anchor(Documents)>>

== Documents ==
Line 17: Line 27:
 * [[Others]]

||<tablewidth="200px"#ffff99>Subsystem ||<#ffff99>Name ||<#ffff99>Model ||<#ffff99>Interface ||<#ffff99>Location ||<#ffff99>Quantity ||<#ffff99>Priority ||
||Vac ||Gate Valve || || || ||7 ||Mid ||
||VIS ||Suspension Watchdog || ||Analog Voltage, Relay Switches ||Every suspension ||11 ||High ||
||Cryo ||Temp. Monitor || ||RS-232C ||Every Cryostat ||8 ||Low ||
||Laser ||LD Current Monitor ||Analog Voltage || || ||4 ||High ||
||IOO-AOS ||Shutter || || ||Dark Port ||1 ||Mid ||
||VIS-AOS ||Earthquake alert(?) by Optical Lever || || ||Every SASed Mirror ||14 ||Mid ||
||VIS-AOS ||Range Over alert in Optical Lever on Obs. mode || || ||Every SASed Mirror ||14 ||Mid ||
||VAC-AOS ||Automatic Target Control Signal in Arm Tubes || || ||Every target ||greater than 8? ||Mid ||
|| || || || || || || ||
|| || || || || || || ||
 * [[InstrumentControl/Others]]
Line 34: Line 31:
 . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=761|日立造船提案書]]

PLC (Instrument Control) Working Group

Scope

Documents

EPICS

Center

X-End

Y-End

The scope of this WG.

Implement the followings:

  • Remote monitor of instruments deployed throughout the site.
  • Remote manipulation of the instruments
  • Automatic sequential control of the instruments in response to emergency situations.

Documents

KAGRA Instrument Control Requirements

List of instruments to be controlled

その他資料

Possible Scenarios of Emergencies

ーーあり得る環境異常ーー

(電気) サージ 過電圧・電圧低下 瞬間停電 遠隔静電位差 静電気

(水) 漏水 水流停止

(空気) 風量 酸素濃度 有機溶剤濃度 温度 湿度 結露

(粉塵・菌類) 粉塵 菌類

(火事)

ーーありえる大きな機器異常ーー

(1)真空機器 (購入時に付随している自己防護・モニター機能でどこまでカバーされているか?) 真空ポンプ動作 リーク GVの動作 真空センサー 窓破壊

(2)PT冷凍機器 (購入時に付随している自己防護・モニター機能でどこまでカバーされているか?) 過剰振動・音 水冷停止 ガスリークなど

(3)クライオスタット 低温時真空暴露 ジャケット剥離 ジャケット焼失 温度異常

(4)レーザーと付随系 自己防護機能で期待されるもの? (過電流、過出力、水冷空冷停止、温度、粉塵?) 周辺光学機器(散乱、焼失) 壁面焼失 散乱 帯電?

(5)入出射光学系まわり ホトディテクター(過光量、過電流、過温度) 散乱光吸収板(過温度、水冷空冷停止、煙霧) 誤接触 散乱 壁面焼失

(6)クリーン環境機器 ファン停止 ファン振動・音 室温度・湿度と分布 風量減少 粉塵増大

KAGRA/Subgroups/MIF/PLC (last edited 2018-01-18 16:10:42 by YoichiAso)