Size: 796
Comment:
|
Size: 1230
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
=== The scope of this WG. === Implement the followings: |
|
Line 3: | Line 5: |
=== The scope of this WG. === Implement the followings: |
|
Line 9: | Line 8: |
Line 17: | Line 15: |
Line 19: | Line 16: |
||<tablewidth="200px"#ffff99>Subsystem||<#ffff99> Name||<#ffff99>Model||<#ffff99>Interface||<#ffff99>Location||<#ffff99>Quantity|| ||Vac||Gate Valve|| || || || || ||VIS||Suspension Watchdog|| ||Analog Voltage, Relay Switches ||Every suspension|| || ||Cryo||Temp. Monitor|| ||RS-232C||Every Cryostat|| || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || || |
Instrument Control Working Group
The scope of this WG.
Implement the followings:
- Remote monitor of instruments deployed throughout the site.
- Remote manipulation of the instruments
- Automatic sequential control of the instruments in response to emergency situations.
資料
List of instruments to be controlled
Subsystem |
Name |
Model |
Interface |
Location |
Quantity |
Vac |
Gate Valve |
|
|
|
|
VIS |
Suspension Watchdog |
|
Analog Voltage, Relay Switches |
Every suspension |
|
Cryo |
Temp. Monitor |
|
RS-232C |
Every Cryostat |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|