Differences between revisions 3 and 5 (spanning 2 versions)
Revision 3 as of 2012-01-10 16:41:42
Size: 796
Editor: YoichiAso
Comment:
Revision 5 as of 2012-01-10 17:13:57
Size: 1299
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
=== The scope of this WG. ===
Implement the followings:
Line 3: Line 5:
=== The scope of this WG. ===

Implement the followings:
Line 9: Line 8:
Line 17: Line 15:
Line 19: Line 16:
||<tablewidth="200px"#ffff99>Subsystem ||<#ffff99>Name ||<#ffff99>Model ||<#ffff99>Interface ||<#ffff99>Location ||<#ffff99>Quantity ||<#ffff99>Priority||
||Vac ||Gate Valve || || || ||7||High||
||VIS ||Suspension Watchdog || ||Analog Voltage, Relay Switches ||Every suspension ||11||High||
||Cryo ||Temp. Monitor || ||RS-232C ||Every Cryostat ||8||Low||
|| || || || || || || ||
|| || || || || || || ||
|| || || || || || || ||
|| || || || || || || ||
|| || || || || || || ||
|| || || || || || || ||

Instrument Control Working Group

The scope of this WG.

Implement the followings:

  • Remote monitor of instruments deployed throughout the site.
  • Remote manipulation of the instruments
  • Automatic sequential control of the instruments in response to emergency situations.

資料

List of instruments to be controlled

Subsystem

Name

Model

Interface

Location

Quantity

Priority

Vac

Gate Valve

7

High

VIS

Suspension Watchdog

Analog Voltage, Relay Switches

Every suspension

11

High

Cryo

Temp. Monitor

RS-232C

Every Cryostat

8

Low

KAGRA/Subgroups/MIF/PLC (last edited 2018-01-18 16:10:42 by YoichiAso)