Differences between revisions 6 and 7
Revision 6 as of 2012-01-10 17:14:09
Size: 1305
Editor: YoichiAso
Comment:
Revision 7 as of 2012-01-10 17:30:00
Size: 1347
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 20: Line 20:
||Laser ||LD Current Monitor ||Analog Voltage || || ||4 ||High ||
Line 25: Line 26:
|| || || || || || || ||

Instrument Control Working Group

The scope of this WG.

Implement the followings:

  • Remote monitor of instruments deployed throughout the site.
  • Remote manipulation of the instruments
  • Automatic sequential control of the instruments in response to emergency situations.

資料

List of instruments to be controlled

Subsystem

Name

Model

Interface

Location

Quantity

Priority

Vac

Gate Valve

7

Mid

VIS

Suspension Watchdog

Analog Voltage, Relay Switches

Every suspension

11

High

Cryo

Temp. Monitor

RS-232C

Every Cryostat

8

Low

Laser

LD Current Monitor

Analog Voltage

4

High

KAGRA/Subgroups/MIF/PLC (last edited 2018-01-18 16:10:42 by YoichiAso)