Size: 1347
Comment:
|
Size: 1390
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 26: | Line 26: |
== Possible Scenarios of Emergencies == |
Instrument Control Working Group
The scope of this WG.
Implement the followings:
- Remote monitor of instruments deployed throughout the site.
- Remote manipulation of the instruments
- Automatic sequential control of the instruments in response to emergency situations.
資料
List of instruments to be controlled
Subsystem |
Name |
Model |
Interface |
Location |
Quantity |
Priority |
Vac |
Gate Valve |
|
|
|
7 |
Mid |
VIS |
Suspension Watchdog |
|
Analog Voltage, Relay Switches |
Every suspension |
11 |
High |
Cryo |
Temp. Monitor |
|
RS-232C |
Every Cryostat |
8 |
Low |
Laser |
LD Current Monitor |
Analog Voltage |
|
|
4 |
High |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|