Differences between revisions 1 and 8 (spanning 7 versions)
Revision 1 as of 2020-08-25 11:47:34
Size: 167
Comment:
Revision 8 as of 2020-08-26 14:47:58
Size: 861
Editor: haoyu.wang
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
 * Birefringence  * Birefringence [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11792|birefringence_FINESSE.pdf]]
  * Phase relations of s-pol and p-pol need to be checked.
  * A BS model has been built for PRMI. Resonances of carrier and RF sidebands are checked.
Line 10: Line 12:
  * DRFPMI: simple cross check is done [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11921|DRFPMI note]]
  * Ready for simulations
  * HOM expansion hasn't started yet
 * OMC modeling (June Gyu)
  * I found that I did completely wrong.
  * Rebuild the model after cross check at meeting.
  * OMC model drawing [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11955]]

Simulation meeting 2020 Aug 26, 15:00-

Participants

Agenda

Updates from Projects

KAGRA/Subgroups/MIF/Simulation/SimMeeting20200826 (last edited 2020-08-26 17:57:17 by haoyu.wang)