Size: 421
Comment:
|
Size: 789
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= Simulation meeting 2020 Sep 30th 16:00-, zoom3 = | = Simulation meeting 2020 Sep 30th 16:00 = Zoom2: https://zoom.us/j/6676627462 |
Line 5: | Line 6: |
== Minutes == | == Agenda == |
Line 8: | Line 9: |
* | * Aiming the first version during their visit * Added amplitude detectors * Figures were updated * Documenting how to GUI * Confirming if simulation results are correct |
Line 12: | Line 17: |
* Next steps | * Next steps is to inject the simulated AS beam to OMC. But HOM extension of the ifo model hasn't been done. |
Line 15: | Line 20: |
* With Hiro-san's help, we concluded S=>P gets i phase shift! |
Simulation meeting 2020 Sep 30th 16:00
Zoom2: https://zoom.us/j/6676627462
Participants
Agenda
Updates from Projects
- Finesse interface
- Aiming the first version during their visit
- Added amplitude detectors
- Figures were updated
- Documenting how to GUI
- Confirming if simulation results are correct
- Ifo model
- Matrix change when SRM is coming from non-reso to reso in SRC will be calculated (DRMI)
- OMC model
- Next steps is to inject the simulated AS beam to OMC. But HOM extension of the ifo model hasn't been done.
- Birefringence model
Haoyou's report link
With Hiro-san's help, we concluded S=>P gets i phase shift!