Size: 724
Comment:
|
Size: 789
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 20: | Line 20: |
* With Hiro-san's help, we concluded S=>P gets i phase shift! |
Simulation meeting 2020 Sep 30th 16:00
Zoom2: https://zoom.us/j/6676627462
Participants
Agenda
Updates from Projects
- Finesse interface
- Aiming the first version during their visit
- Added amplitude detectors
- Figures were updated
- Documenting how to GUI
- Confirming if simulation results are correct
- Ifo model
- Matrix change when SRM is coming from non-reso to reso in SRC will be calculated (DRMI)
- OMC model
- Next steps is to inject the simulated AS beam to OMC. But HOM extension of the ifo model hasn't been done.
- Birefringence model
Haoyou's report link
With Hiro-san's help, we concluded S=>P gets i phase shift!