= ISC Task List (as of 2021) =
||Task ||People in charge ||Relevant Subsystems ||Comment ||
||Management / Management || || || ||
||Analog electronics / Analog electronics management || || || ||
||Analog electronics / Cabling management || || || ||
||Analog electronics / In-vac PDs and QPDs || || || ||
||Optical table / Optical table cover || || || ||
||Optical table / Optical table optics, high power management || || || ||
||AS port / OMC and beam shutter || || || ||
||Interferometer sensing and controls / Initial alignment || || || ||
||Interferometer sensing and controls / Lock acquisition, arm length stabilization || || || ||
||Interferometer sensing and controls / Length sensing and control || || || ||
||Interferometer sensing and controls / Alignment sensing and control || || || ||
||Interferometer sensing and controls / Laser frequency stabilization || || || ||
||Interferometer sensing and controls / Laser intensity stabilization || || || ||
||Interferometer sensing and controls / RF modulation scheme || || || ||
||Simulation and modeling / Simulations with mirror maps || || || ||
||Simulation and modeling / Noisebudget || || || ||
||Simulation and modeling / Thermal lensing || || || ||
||Simulation and modeling / Parametric instability studies || || || ||


= ISC Task List (as of 2015) =
||<tablewidth="1100px"style="text-align:center">Category ||Task ||Person in Charge ||Relevant Subsystems ||Comment ||
||<style="text-align:center" |3>Management ||Finalize the task list ||<style="text-align:center" |3>Aso, Michimura || || ||
||Assign people to the tasks || || ||
||Make a schedule for iKAGRA ISC tasks || || ||
||<style="text-align:center" |6>Analog Electronics ||Complete the iKAGRA ISC electronics diagram ||Michimura ||<style="text-align:center" |6>MIF, IOO, AEL ||iKAGRA ||
||Make a cabling plan for iKAGRA ||Michimura ||iKAGRA ||
||Installation of the ISC electronics for iKAGRA ||Aso, Nakano ||iKAGRA ||
||List up necessary ISC electronics for bKAGRA ||Michimura, Aso || ||
||Draw an ISC electronics diagram for bKAGRA ||Michimura || ||
||Make a cabling plan for bKAGRA ||Michimura || ||
||<style="text-align:center" |8>Digital Control ||Make a channel list for iKAGRA ISC (including whether each channel needs a whitening filter) ||Kokeyama ||<style="text-align:center" |8>MIF, IOO, DGS ||iKAGRA ||
||Write ISC real time codes for iKAGRA ||Students+Kokeyama,Michimura ||iKAGRA ||
||Create MEDM screens for iKAGRA ||Students+Kokeyama,Michimura ||iKAGRA ||
||Write guardian scripts for iKAGRA ||Students+Kokeyama,Michimura ||iKAGRA ||
||Make a channel list for bKAGRA ISC ||Kokeyama || ||
||Write ISC real time codes for bKAGRA ||Students+Kokeyama,Michimura || ||
||Create MEDM screens for bKAGRA ||Students+Kokeyama,Michimura || ||
||Write guardian scripts for bKAGRA ||Students+Kokeyama,Michimura || ||
||<style="text-align:center" |6>Cameras ||Decide where to put cameras ||Aso, Kokeyama ||AOS, MIF, IOO ||iKAGRA ||
||Figure out how to mount the cameras ||Aso, Kokeyama ||AOS, MIF, IOO ||iKAGRA ||
||Test the camera server ||Kokeyama, Aso ||AOS, MIF, IOO ||iKAGRA ||
||Buy more cameras ||Aso ||AOS, MIF, IOO ||iKAGRA ||
||Install the cameras ||Kokeyama, Aso + Students ||AOS, MIF, IOO ||iKAGRA ||
||Consider how to look at the cryogenic mirror surfaces ||Tomaru ?, Aso ||CRY,MIF || ||
||<style="text-align:center" |6>Preparation of detection bench ||iKAGRA REFL bench layout ||TBD ||IOO ||iKAGRA ||
||bKAGRA REFL layout ||Kawamura+Students ||IOO || ||
||bKAGRA POP/Green layout ||Kawamura+Students ||IOO || ||
||bKAGRA POS/Green layout ||Kawamura+Students ||IOO || ||
||bKAGRA POX/POY layout ||Kawamura+Students ||IOO || ||
||in-VAC PD ||Doi, Aso ||MIF, IOO || ||
||<style="text-align:center" |3>Initial Alignment ||Write a document of the initial alignment procedure for iKAGRA ||Michimura ||MIF ||iKAGRA ||
||Actually perform the initial alignment of iKAGRA ||Michimura+Students ||MIF ||iKAGRA ||
||Write a document of the initial alignment procedure for bKAGRA ||Michimura ||MIF || ||
||<style="text-align:center" |1>Mode Cleaner Commissioning ||List up measurements to be done with iKAGRA ||Kawamura ||IOO ||iKAGRA ||
||<style="text-align:center" |1>iKAGRA Commissioning ||List up measurements to be done with iKAGRA ||Aso ||MIF ||iKAGRA ||
||<style="text-align:center" |5>ISC Modeling ||Build a model of iKAGRA with Chris's noise budget code ||Students+Michimura ||MIF ||iKAGRA ||
||Make a noise budget for iKAGRA ||Students+Michimura ||MIF ||iKAGRA ||
||Build a model of bKAGRA with Chris's noise budget code ||Students+Michimura ||MIF || ||
||Make a noise budget for bKAGRA ||Students+Michimura ||MIF || ||
||Fix the laser frequency stabilization servo design ||Michimura, Aso ||MIF, IOO || ||
||<style="text-align:center" |5>IFO Optical Simulations ||FFT simulations with realistic mirror maps ||Hirose, H. Yamamoto ||MIF || ||
||Decide whether IBF is necessary or not ||Aso, Hirose, Somiya, Michimura ||MIF,MIR || ||
||Set requirements on the OMC and ITM polishing ||Somiya, H.Yamamoto ||MIF,IOO,MIR || ||
||Requirements on the PRG, intra-cavity power, contrast defects ||JANGO ||MIF || ||
||Thermal lensing of the MIF mirrors ||JANGO(H. Yamamoto) ||MIF || ||
||<style="text-align:center" |6>AS port optics ||Overall design of the AS optics ||Somiya+Students ||IOO, MIF || ||
||OFI design ||TBD ||IOO,MIF || ||
||OMMT design ||TBD ||IOO,MIF || ||
||Steering mirrors ||TBD ||IOO,MIF || ||
||OMC design ||Somiya+Students ||IOO,MIF || ||
||Vibration isolation scheme for output optics ||Somiya ||IOO, VIS || ||
||<style="text-align:center" |4>Laser power management ||How to change the laser power during the operation ||TBD ||IOO,MIF || ||
||Check the compatibility of the variable laser power with cryogenics ||K. Yamamoto ||CRY,MIF || ||
||Beam shutters (in-air, in-vac) ||Somiya + Students ||IOO || ||
||High power beam damps ||Akutsu ||AOS || ||
||<style="text-align:center" |6>Lock Acquisition ||Simulation of the signals with various interferometer configurations (DRMI, PRFPMI, etc) using Optickle and Finesse (cross check) ||Students + Michimura, Aso ||MIF || ||
||Design of the ALS ||TBD ||IOO,MIF || ||
||Review the noise budget for the ALS ||TBD ||IOO,MIF || ||
||Make design drawings of the ALS ||TBD ||IOO,MIF || ||
||Deceide a scheme to generate f3 & f1 (AM) sidebands ||Nakano, Michimura, Uehara, Somiya ||IOO || ||
||Write a document for the lock acquisition procednure ||Students + Aso ||MIF || ||
||<style="text-align:center" |1>bKAGRA commmissioning ||Make a commissioning plan ||Aso ||MIF || ||