Differences between revisions 2 and 3
Revision 2 as of 2021-08-25 15:07:09
Size: 316
Comment:
Revision 3 as of 2021-08-25 15:47:10
Size: 522
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
Participants: Matteo, KYamamoto, Simon, HYamamoto, Haoyu, Bazzan, Aso Participants: Matteo, KYamamoto, Simon, HYamamoto, Haoyu, Bazzan, Aso, Marc, Abe
Line 9: Line 9:
 1. Report on stress-birefringence paper: currently doing internal review and in mid-September will be shared with MIR group
 1. Report from Haoyu about status of TWE-birefringence simulations

MIR Meeting on 2021/08/25 15:00 - 16:00

Participants: Matteo, KYamamoto, Simon, HYamamoto, Haoyu, Bazzan, Aso, Marc, Abe

Next meeting

2021 September 22, 15:00 - 16:00

Minutes

  1. Report of ETMY cleaning: installation successful after cleaning
  2. Report on stress-birefringence paper: currently doing internal review and in mid-September will be shared with MIR group
  3. Report from Haoyu about status of TWE-birefringence simulations

Agenda

  • Stress-birefringence paper
  • AOB

KAGRA/Subgroups/MIR/Meetings/Minutes20210825 (last edited 2021-08-25 15:47:17 by matteo.leonardi)