Differences between revisions 1 and 2
Revision 1 as of 2024-06-06 09:38:33
Size: 1468
Comment:
Revision 2 as of 2024-06-06 09:39:04
Size: 1467
Comment:
Deletions are marked like this. Additions are marked like this.
Line 23: Line 23:
    * Switch to 2 meetings/months     * Switch to 2 meetings/month
  • Participants :

T. Akutsu, Y. Aso, M. Eisenmann, S. Lee, M. Otsuka, H. Saint-Olive, S. Singh, K. Yamamoto

  • Topics :
    • New ITMs :
      • Okamoto will grind the chirp close to AR side during ~ 1 month
      • Nikon will spend 2 weeks/surface to pre-polish each surface to remove scratches
      • overall 10 weeks delay expected (now waiting for quotation) but should be fine with respect to LMA schedule for coating
    • Birefringence measurement :
      • can use pair of LCs to measure Jones matrix, diattenuation and birefringence of samples in transmission and reflection
      • now checking long term stability and improvement of uncertainty
      • is it interesting to measure KAGRA BS properties? if so do we have witness sample?
    • 10years plan :
      • iLM/LMA can grow 30cm diameter sapphire with some(?) down to 20-30ppm/cm absorption. They are now trying to reduce birefringence
      • Jerome Degallaix (LMA) will be invited at an upcomming meeting
      • AZTEC CEO changed and Mr. Hong who grown our substrates is creating his own start-up. Sungho purchase 30mm and 60mm new samples from AZTEC to be characterized.
    • PI simulations
      • Otsuka plans to study PI and their mitigation for KAGRA
      • Kaihotsu and Kaido thesis presents such investigation : worth trying to repeat this simulation with bonding layers and different aspect-ratios?
    • next meeting :
      • Switch to 2 meetings/month
      • next meeting on June 19th

KAGRA/Subgroups/MIR/Meetings/Minutes20240605 (last edited 2024-06-06 09:39:04 by marc.eisenmann)