=== Hammering test === ==== Task list (Done) ==== * Hammering test of the OMC chamber (Done 22nd Feb.) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13105|klog13105]] * There is excess in the sensitivity between 100 Hz to 400 Hz * Reported later, the main reason the vibration to the OMC legs for the optical table inside the vacuum * Hammering test AS table (Done 22nd Feb.) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13105|klog13105]] * * Reflection light check (Done 22nd Feb.) ==== Task list (Partially done) ==== ==== Task list (todo ; must items) ==== ==== Task list (todo ; if possible) ==== |
Memo for Commissioning break (Mar. 2020)
Hammering test
Task list (Done)
- Hammering test of the OMC chamber (Done 22nd Feb.)
- There is excess in the sensitivity between 100 Hz to 400 Hz
- Reported later, the main reason the vibration to the OMC legs for the optical table inside the vacuum
- Hammering test AS table (Done 22nd Feb.)
- Reflection light check (Done 22nd Feb.)
Task list (Partially done)
Task list (todo ; must items)