Differences between revisions 18 and 20 (spanning 2 versions)
Revision 18 as of 2020-03-09 04:27:31
Size: 1227
Comment:
Revision 20 as of 2020-03-09 05:59:37
Size: 3182
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
Line 10: Line 11:
Line 13: Line 15:
Line 20: Line 23:
 * Hammering test SRM chamber (Done 22nd Feb.)
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13105|klog13105]]
  * The SRM mirror is misaligned. So We need to investigate the scattering light from SRM mirror
  * In this test, we can see the excess above 100 Hz
  * After this test, we cannot lock the interferometer. So if we have a time, we want to check again.

Line 21: Line 31:

 * Hammering test between PR2 and BS, PR2 side (Done 24th Feb.)
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13138|klog13138]]
  * PR2-BS duct give excess noise around 70-100 Hz

 * Hammering test between PR2 and BS, PR2 side (Done 24th Feb.)
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13138|klog13138]]
  * PR2-BS duct give excess noise around 70-100 Hz

 * Hammering test between BS and SR2, BS side (Done 24th Feb.)
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13138|klog13138]]
  * BS-SR2 duct give slight excess noise but not much

 * Hammering test between BS and SR2, SR2 side (Done 24th Feb.)
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13138|klog13138]]
  * BS-SR2 duct give slight excess noise but not much

 * Hammering test between SR2 and SR3, SR2 side (Done 24th Feb.)
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13138|klog13138]]
  * SR2-SR3 duct give broadband exces noise around 100-400 Hz

 * Hammering test between SR2 and SR3, SR3 side (Done 24th Feb.)
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13138|klog13138]]
  * SR2-SR3 duct give broadband exces noise around 100-400 Hz

 * Hammering test between SR3 and SRM, SR3 side (Done 24th Feb.)
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13138|klog13138]]
Line 25: Line 63:
 * Hammering test around BS
  * Possible noise source
Line 28: Line 69:

=== Task list (Done) ===
 * Vibration injection to OMC leg for optical table
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13152|klog13152]]
  * We confirmed that the vibration from OMC leg is under the sensitivity curve

=== Task list (todo ; must items) ===

Memo for Commissioning break (Mar. 2020)

- Hammering test

Task list (Done)

  • Hammering test of the OMC chamber (Done 22nd Feb.)
    • klog13105

    • There is excess in the sensitivity between 100 Hz to 400 Hz
    • Reported later, the main reason is the vibration to the OMC legs for the optical table inside the vacuum
  • Hammering test AS table (Done 22nd Feb.)
    • klog13105

    • Reported later, the main reason is the vibration to the OMC legs for the optical table inside the vacuum
  • Reflection light check (Done 22nd Feb.)
    • klog13105

    • Now we didn't use the AS PD signals for interferometer control
    • There was possibility that the reflection light from AS table make dirty scattering light
    • Shadowed between the OMC viewport and AS table, but we couldn't see the clear noise reduction
    • Also, when we added vibration to the OMC viewport, we couldn't detect the noise increasing.
  • Hammering test SRM chamber (Done 22nd Feb.)
    • klog13105

    • The SRM mirror is misaligned. So We need to investigate the scattering light from SRM mirror
    • In this test, we can see the excess above 100 Hz
    • After this test, we cannot lock the interferometer. So if we have a time, we want to check again.

Task list (Partially done)

  • Hammering test between PR2 and BS, PR2 side (Done 24th Feb.)
    • klog13138

    • PR2-BS duct give excess noise around 70-100 Hz
  • Hammering test between PR2 and BS, PR2 side (Done 24th Feb.)
    • klog13138

    • PR2-BS duct give excess noise around 70-100 Hz
  • Hammering test between BS and SR2, BS side (Done 24th Feb.)
    • klog13138

    • BS-SR2 duct give slight excess noise but not much
  • Hammering test between BS and SR2, SR2 side (Done 24th Feb.)
    • klog13138

    • BS-SR2 duct give slight excess noise but not much
  • Hammering test between SR2 and SR3, SR2 side (Done 24th Feb.)
    • klog13138

    • SR2-SR3 duct give broadband exces noise around 100-400 Hz
  • Hammering test between SR2 and SR3, SR3 side (Done 24th Feb.)
    • klog13138

    • SR2-SR3 duct give broadband exces noise around 100-400 Hz
  • Hammering test between SR3 and SRM, SR3 side (Done 24th Feb.)

Task list (todo ; must items)

  • Hammering test around BS
    • Possible noise source

Task list (todo ; if possible)

- PEM injection

Task list (Done)

  • Vibration injection to OMC leg for optical table
    • klog13152

    • We confirmed that the vibration from OMC leg is under the sensitivity curve

Task list (todo ; must items)

KAGRA/Subgroups/PEM/MAR2020 (last edited 2020-03-21 04:36:19 by TakaakiYokozawa)