Size: 5457
Comment:
|
Size: 5856
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
== Priority of task == * |
|
Line 70: | Line 74: |
* We didn't get any information from those chambers | * We don't have any information from those chambers yet. |
Line 95: | Line 99: |
* Hammering test of the MCF-PSL tube |
|
Line 96: | Line 102: |
* Hammering test of the IXA and IYA chamber * Non black coating materials * Hammering test of the end station * EXC, EYC, EXA, EYA chambers * TMSX, TMSY chamber |
|
Line 100: | Line 113: |
* Vibration injection to OMC leg for optical table | * Vibration injection to OMC legs |
Line 102: | Line 115: |
* We confirmed that the vibration from OMC leg is under the sensitivity curve | * We confirmed that the vibration of the OMC leg is under the sensitivity curve |
Line 135: | Line 148: |
* Clean up on the optical table |
|
Line 136: | Line 151: |
* Turn off the some lights * Clean up the experimental area * Clean environment may make the clean experiment |
Memo for Commissioning break (Mar. 2020)
Priority of task
- Hammering test
Task list (Done)
- Hammering test of the OMC chamber (Done 22nd Feb.)
- There is excess in the sensitivity between 100 Hz to 400 Hz
- Reported later, the main reason is the vibration to the OMC legs for the optical table inside the vacuum
- Hammering test AS table (Done 22nd Feb.)
- Reported later, the main reason is the vibration to the OMC legs for the optical table inside the vacuum
- Reflection light check (Done 22nd Feb.)
- Now we didn't use the AS PD signals for interferometer control
- There was possibility that the reflection light from AS table make dirty scattering light
- Shadowed between the OMC viewport and AS table, but we couldn't see the clear noise reduction
- Also, when we added vibration to the OMC viewport, we couldn't detect the noise increasing.
- Hammering test SRM chamber (Done 22nd Feb.)
- The SRM mirror is misaligned. So We need to investigate the scattering light from SRM mirror
- In this test, we can see the excess above 100 Hz
- After this test, we cannot lock the interferometer. So if we have a time, we want to check again.
Task list (Partially done)
- Hammering test between PR2 and BS, PR2 side (Done 24th Feb.)
- PR2-BS duct give excess noise around 70-100 Hz
- Hammering test between PR2 and BS, PR2 side (Done 24th Feb.)
- PR2-BS duct give excess noise around 70-100 Hz
- Hammering test between BS and SR2, BS side (Done 24th Feb.)
- BS-SR2 duct give slight excess noise but not much
- Hammering test between BS and SR2, SR2 side (Done 24th Feb.)
- BS-SR2 duct give slight excess noise but not much
- Hammering test between SR2 and SR3, SR2 side (Done 24th Feb.)
- SR2-SR3 duct give broadband exces noise around 100-400 Hz
- Hammering test between SR2 and SR3, SR3 side (Done 24th Feb.)
- SR2-SR3 duct give broadband exces noise around 100-400 Hz
- Hammering test between SR3 and SRM, SR3 side (Done 24th Feb.)
Task list (todo ; must items)
- Hammering test around BS chamber
- Possible noise source 70-100Hz
- Identification the noise path
- From leg? From oplev? From duct?
- Set accelerometer for feed-forward
- Hammering test of the PR2, PR3, PRM, IMMT2 chamber
- We don't have any information from those chambers yet.
- Hammering test of the IMMT1 chamber
- This chamber is including the ISS system
- We performed the acoustic injection and identified the some noise peaks.
- We placed the accelerometer on the leg of the IMMT1 chamber
- Identification of the noise path
- Hammering test of the MCF chamber
- We performed the acoustic injection and identified the some noise peaks.
- We placed the accelerometer on the leg of the IMMT1 chamber
- Identification of the noise path
- Hammering test of the cryochamber
- Hammering test of the ducts
- To check the scattered light effect, we want to perform the hammering test to the all ducts
- We will ask Akutsu-san and Aso-san for the priority for following test
- Hammering test of the optical tables
- (Must) IMC REFL table, REFL table, POP table
- (Should) POS table, TMSX table, TMSY table
(If possible) OpLev tables, PCal tables
- Hammering test of the MCF-PSL tube
Task list (todo ; if possible)
- Hammering test of the IXA and IYA chamber
- Non black coating materials
- Hammering test of the end station
- EXC, EYC, EXA, EYA chambers
- TMSX, TMSY chamber
- PEM injection
Task list (Done)
- Vibration injection to OMC legs
- We confirmed that the vibration of the OMC leg is under the sensitivity curve
- Acoustic injection to the PSL room(29th Feb.)
- We couldn't find the any excess
- Acoustic injection to REFL table(29th Feb., 5th Mar. 7th Mar.)
Task list (todo ; must items)
- Vibration injection to legs of the chambers
- After hammering test, we will investigate the environmental vibration may appear to the sensitivity or not
- Acoustic injection to the POP table
Task list (todo ; if possible)
- Acoustic injection to the cryochamber
- Magnetic injection
- Other task by PEM(?)
Task list (done)
Task list (todo)
- Check and remove the unused cables
- Clean up on the optical table
- Check and turn off the unnecessary instrument
- Turn off the some lights
- Clean up the experimental area
- Clean environment may make the clean experiment