Size: 683
Comment:
|
Size: 1593
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
== Memo for Commissioning break (Mar. 2020) == | = Memo for Commissioning break (Mar. 2020) = |
Line 3: | Line 3: |
=== Hammering test === | == - Hammering test == |
Line 5: | Line 5: |
==== Task list (Done) ==== | === Task list (Done) === |
Line 9: | Line 9: |
* Reported later, the main reason the vibration to the OMC legs for the optical table inside the vacuum | * Reported later, the main reason is the vibration to the OMC legs for the optical table inside the vacuum |
Line 12: | Line 12: |
* | * Reported later, the main reason is the vibration to the OMC legs for the optical table inside the vacuum |
Line 14: | Line 14: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13105|klog13105]] * Now we didn't use the AS PD signals for interferometer control * There was possibility that the reflection light from AS table make dirty scattering light * Shadowed between the OMC viewport and AS table, but we couldn't see the clear noise reduction * Also, when we added vibration to the OMC viewport, we couldn't detect the noise increasing. * Hammering test SRM chamber (Done 22nd Feb.) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13105|klog13105]] * The SRM mirror is misaligned. So We need to investigate the scattering light from SRM mirror * In this test, we can see the excess above 100 Hz * After this test, we cannot lock the interferometer. So if we have a time, we want to check again. |
|
Line 15: | Line 25: |
==== Task list (Partially done) ==== | === Task list (Partially done) === |
Line 18: | Line 28: |
==== Task list (todo ; must items) ==== | === Task list (todo ; must items) === |
Line 20: | Line 30: |
==== Task list (todo ; if possible) ==== | === Task list (todo ; if possible) === == - PEM injection == |
Memo for Commissioning break (Mar. 2020)
- Hammering test
Task list (Done)
- Hammering test of the OMC chamber (Done 22nd Feb.)
- There is excess in the sensitivity between 100 Hz to 400 Hz
- Reported later, the main reason is the vibration to the OMC legs for the optical table inside the vacuum
- Hammering test AS table (Done 22nd Feb.)
- Reported later, the main reason is the vibration to the OMC legs for the optical table inside the vacuum
- Reflection light check (Done 22nd Feb.)
- Now we didn't use the AS PD signals for interferometer control
- There was possibility that the reflection light from AS table make dirty scattering light
- Shadowed between the OMC viewport and AS table, but we couldn't see the clear noise reduction
- Also, when we added vibration to the OMC viewport, we couldn't detect the noise increasing.
- Hammering test SRM chamber (Done 22nd Feb.)
- The SRM mirror is misaligned. So We need to investigate the scattering light from SRM mirror
- In this test, we can see the excess above 100 Hz
- After this test, we cannot lock the interferometer. So if we have a time, we want to check again.
Task list (Partially done)
Task list (todo ; must items)
Task list (todo ; if possible)