Size: 706
Comment:
|
Size: 694
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
=== Hammering test === | == Hammering test == |
Line 5: | Line 5: |
==== Task list (Done) ==== | === Task list (Done) === |
Line 15: | Line 15: |
==== Task list (Partially done) ==== | === Task list (Partially done) === |
Line 18: | Line 18: |
==== Task list (todo ; must items) ==== | === Task list (todo ; must items) === |
Line 20: | Line 20: |
==== Task list (todo ; if possible) ==== | === Task list (todo ; if possible) === |
Line 22: | Line 22: |
=== PEM injection === | == PEM injection == |
Memo for Commissioning break (Mar. 2020)
Hammering test
Task list (Done)
- Hammering test of the OMC chamber (Done 22nd Feb.)
- There is excess in the sensitivity between 100 Hz to 400 Hz
- Reported later, the main reason the vibration to the OMC legs for the optical table inside the vacuum
- Hammering test AS table (Done 22nd Feb.)
- Reflection light check (Done 22nd Feb.)
Task list (Partially done)
Task list (todo ; must items)
Task list (todo ; if possible)