Size: 980
Comment:
|
← Revision 5 as of 2018-08-21 18:13:50 ⇥
Size: 531
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
* [[attachment:PEM_180807.pdf|Yokozawa presentation]] * Kick off PEM projects [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8401|URL]] * Members, schedule [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8469|URL]] |
* [[attachment:PEM_180821.pdf|Yokozawa presentation]] |
Line 10: | Line 6: |
* rack check [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/RachCable|URL]] | |
Line 13: | Line 8: |
* BS re-cabling [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8479|URL]] * PEM placement [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8435|URL]] * Ondotori system |
|
Line 19: | Line 11: |
* Detector flags for future joint observation | * Magnetic filed measurement during power down(10th Sep.) |
Line 22: | Line 14: |
* Seismometer * PSL PEM * Commissioning tools |
* Seismometer (Miyo) * PSL PEM (Kaihotsu, Mori)[[attachment:pem_mori_kaihotsu_180821.pdf|pdf]] * Commissioning tools (Tagoshi, Yuzurihara) |
2018/08/07 PEM meeting topics
- Yokozawa activities
- TCam issue
- Air monitors
- BS coil transfer function measurement
- Microphone selection
- Magnetometer circuits
- Magnetic filed measurement during power down(10th Sep.)
- Activity report
- Seismometer (Miyo)
PSL PEM (Kaihotsu, Mori)pdf
- Commissioning tools (Tagoshi, Yuzurihara)
- Semi-auto coherent calculation system