Differences between revisions 2 and 4 (spanning 2 versions)
Revision 2 as of 2018-08-21 08:22:52
Size: 377
Comment:
Revision 4 as of 2018-08-21 08:24:41
Size: 484
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
  * Magnetic filed measurement during power down(10th Sep.)
Line 13: Line 14:
  * Seismometer
  * PSL PEM
  * Commissioning tools
  * Seismometer (Miyo)
  * PSL PEM (Kaihotsu, Mori)
  * Commissioning tools (Tagoshi, Yuzurihara)

2018/08/07 PEM meeting topics

  • Yokozawa presentation

  • Yokozawa activities
    • TCam issue
    • Air monitors
    • BS coil transfer function measurement
    • Microphone selection
    • Magnetometer circuits
    • Magnetic filed measurement during power down(10th Sep.)
  • Activity report
    • Seismometer (Miyo)
    • PSL PEM (Kaihotsu, Mori)
    • Commissioning tools (Tagoshi, Yuzurihara)
    • Semi-auto coherent calculation system

KAGRA/Subgroups/PEM/Meeting/180821/Agenda (last edited 2018-08-21 18:13:50 by TakaakiYokozawa)