Differences between revisions 2 and 3
Revision 2 as of 2018-12-11 11:46:32
Size: 657
Comment:
Revision 3 as of 2018-12-11 11:47:14
Size: 689
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
  * Commissioning tool(譲原)

2018/12/11 PEM meeting topics

  • Yokozawa activities(Almost reported in the last F2F meeting)pdf

    • Caltech/LLO visiting
    • PEM installation to X end Pcal area
    • PEM installation to POP table, IMC refl table, IFI refl table
    • PEM installation to TMSX
  • Activity report
    • Seismometer measurement, measurement plan, airmonitor (三代)
    • PEM guardian (三代)
    • PSL characterization(T田中、冨士川)
    • 卒論に向けたPEMs(開発、森)
    • IMC refl activity report(T田中)
    • Commissioning tool(譲原)
  • External report(after this meeting)
    • LLO帰朝報告 (横澤)
  • 次回meeting
    • ???

KAGRA/Subgroups/PEM/Meeting/181211/Agenda (last edited 2018-12-11 11:47:14 by TakaakiYokozawa)