* Yokozawa activities(Almost reported in the last F2F meeting) * Caltech/LLO visiting * PEM installation to X end Pcal area * PEM installation to POP table, IMC refl table, IFI refl table * PEM installation to TMSX * Activity report * Seismometer measurement, measurement plan, airmonitor (三代) * PEM guardian (三代) * PSL characterization(T田中、冨士川) * 卒論に向けたPEMs(開発、森) * IMC refl activity report(T田中) * External report(after this meeting) * LLO帰朝報告 (横澤) |
Minute of PEM meeting
- Date: 2018/12/11 18:00-19:00(JST)
- Attendance:
- eZuce:
* Yokozawa activities(Almost reported in the last F2F meeting)
- Caltech/LLO visiting
- PEM installation to X end Pcal area
- PEM installation to POP table, IMC refl table, IFI refl table
- PEM installation to TMSX
- Activity report
- Seismometer measurement, measurement plan, airmonitor (三代)
- PEM guardian (三代)
- PSL characterization(T田中、冨士川)
- 卒論に向けたPEMs(開発、森)
- IMC refl activity report(T田中)
- External report(after this meeting)
- LLO帰朝報告 (横澤)
- 次回meeting
- 2