Size: 497
Comment:
|
Size: 612
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 14: | Line 14: |
* Miyo(Seismonn, circuit, seismometer analysis/schedule) | * Miyo(Seismonn, [[https://github.com/gw-pem/kagra-pem/issues/123|ThermometerAmp]], seismometer analysis/schedule) |
Line 16: | Line 16: |
* Oshino(Ondotori) | * Oshino(Ondotori [[https://github.com/gw-pem/kagra-pem/issues/120|#120]]) |
Weekly PEM meeting
- 2019/3/5(火) 17:30-
=== Agenda ===
- Start the discussion about PEM injection
- Start the discussion about detector health
- Virgo visitors(preliminary)
- each member progress
- Yokozawa (air conditioner vibration)
- Washimi (magnetometer)
Miyo(Seismonn, ThermometerAmp, seismometer analysis/schedule)
- TTanaka(Sound, JPS)
Oshino(Ondotori #120)
- Kozakai(PEM analysis with GWpy)
- Kaihotsu, Mori(after thesis)
- github progress