Size: 573
Comment:
|
Size: 730
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
* Search the shaker(vibration) injection | * Study of the shaker(vibration) injection |
Line 15: | Line 15: |
* Washimi (LHO report) [[attachment:washimi_PEMmeeting_20190319.pdf|pdf]] | * (already done) Washimi (LHO report) [[attachment:washimi_PEMmeeting_20190319.pdf|pdf]] * Yokozawa * Schedule and plan for the Virgo collaborator visiting |
Line 18: | Line 20: |
* weather station KAGRA entrance * TTanaka * RF issue |
Weekly PEM meeting
- 2019/3/19(火) 17:30-
=== Agenda ===
- Start the discussion about PEM injection
- Study of the shaker(vibration) injection
- Discussion with VIS team
- Discussion with LAS(+IOO,MIF) team
- magnetic field injection
- acoustic field injection
- RF injection
- etc.
- each member progress
(already done) Washimi (LHO report) pdf
- Yokozawa
- Schedule and plan for the Virgo collaborator visiting
- Miyo
- seismometer analysis/schedule
- weather station KAGRA entrance
- TTanaka
- RF issue
- Kozakai(PEM analysis with GWpy and future)
- Kaihotsu, Mori(after thesis)
- github progress