Differences between revisions 3 and 7 (spanning 4 versions)
Revision 3 as of 2019-03-22 13:52:55
Size: 573
Comment:
Revision 7 as of 2019-03-26 17:32:43
Size: 803
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * 2019/3/19(火) 17:30-  * 2019/3/26(火) 17:30-
Line 5: Line 5:
 * Face to Face meeting
  * oral presentation
  * poster presentation
Line 6: Line 9:
  * Search the shaker(vibration) injection   * Study of the shaker(vibration) injection
Line 15: Line 18:
  * Washimi (LHO report) [[attachment:washimi_PEMmeeting_20190319.pdf|pdf]]   * (already done) Washimi (LHO report) [[attachment:washimi_PEMmeeting_20190319.pdf|pdf]]
  * Yokozawa
   * Schedule and plan for the Virgo collaborator visiting
Line 18: Line 23:
   * weather station KAGRA entrance
  * TTanaka
   * RF issue

Weekly PEM meeting

  • 2019/3/26(火) 17:30-

=== Agenda ===

  • Face to Face meeting
    • oral presentation
    • poster presentation
  • Start the discussion about PEM injection
    • Study of the shaker(vibration) injection
    • Discussion with VIS team
    • Discussion with LAS(+IOO,MIF) team
    • magnetic field injection
    • acoustic field injection
    • RF injection
    • etc.
  • each member progress
    • (already done) Washimi (LHO report) pdf

    • Yokozawa
      • Schedule and plan for the Virgo collaborator visiting
    • Miyo
      • seismometer analysis/schedule
      • weather station KAGRA entrance
    • TTanaka
      • RF issue
    • Kozakai(PEM analysis with GWpy and future)
    • Kaihotsu, Mori(after thesis)
  • github progress

KAGRA/Subgroups/PEM/Meeting/190319/Agenda (last edited 2019-03-27 11:00:59 by chihiro.kozakai)