* Date: 2019/3/19 17:30-18:00(JST) * Attendance: |
* Date: 2019/3/26 17:30-18:00(JST) * Attendance: Yokozawa, Oshino, Yamat, Kozakai, Yuzurihara, Fujikawa, Oshino, Kokeyama, Miyo |
Line 9: | Line 9: |
=== Agenda === * Face to Face meeting * oral presentation * poster presentation * Start the discussion about PEM injection * Study of the shaker(vibration) injection * Discussion with VIS team * Discussion with LAS(+IOO,MIF) team * magnetic field injection * acoustic field injection * RF injection * etc. |
|
Line 10: | Line 23: |
=== Agenda === | * each member progress * (already done) Washimi (LHO report) * Yokozawa * Schedule and plan for the Virgo collaborator visiting * Miyo * seismometer analysis/schedule * weather station KAGRA entrance * TTanaka * RF issue * Kozakai(PEM analysis with GWpy and future) * 年末の静かなデータを見る * 柏のサーバのサンプルプログラムを用意 * * Kaihotsu, Mori(after thesis) * Yuzurihara * Yuzu summary pageが止まることがあったのですが、復旧しました。 * 苔山さんに追加をお願いしたチャンネルを追加した。 * github progress |
Minute of PEM meeting
- Date: 2019/3/26 17:30-18:00(JST)
- Attendance: Yokozawa, Oshino, Yamat, Kozakai, Yuzurihara, Fujikawa, Oshino, Kokeyama, Miyo
=== Agenda ===
- Face to Face meeting
- oral presentation
- poster presentation
- Start the discussion about PEM injection
- Study of the shaker(vibration) injection
- Discussion with VIS team
- Discussion with LAS(+IOO,MIF) team
- magnetic field injection
- acoustic field injection
- RF injection
- etc.
- each member progress
- (already done) Washimi (LHO report)
- Yokozawa
- Schedule and plan for the Virgo collaborator visiting
- Miyo
- seismometer analysis/schedule
- weather station KAGRA entrance
- TTanaka
- RF issue
- Kozakai(PEM analysis with GWpy and future)
- 年末の静かなデータを見る
- 柏のサーバのサンプルプログラムを用意
- Kaihotsu, Mori(after thesis)
- Yuzurihara
- Yuzu summary pageが止まることがあったのですが、復旧しました。
- 苔山さんに追加をお願いしたチャンネルを追加した。
- github progress