Size: 193
Comment:
|
← Revision 7 as of 2019-05-28 17:58:08 ⇥
Size: 2956
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
* Attendance: Yokozawa, Oshino, Miyo, TTanaka, Washimi, Kozakai, Yokozawa, Fujikawa, Mori, Kaihotsu | * Attendance: Yokozawa, Oshino, Miyo, TTanaka, Washimi, Kozakai, Yokozawa, Fujikawa, Mori, Kaihotsu, Yuzurihara, Yamat, Okutomi, Kokeyama |
Line 8: | Line 8: |
* General issue * Task list toward the O3 * [[attachment:O3task_PEM_20191526.txt|mail]] * Please send e-mail to me if you have comments. * KIW6 * Wohan, China [[http://kiw6.csp.escience.cn/dct/page/1|URL]] * Washimi, Kaihotsu * Review/practice of the presentation at 18th. Jun 16:00- or 18:00- * TAUP2019 * Toyama, Japan [[http://taup2019.icrr.u-tokyo.ac.jp|URL]] * Yokozawa, Miyo, (?) * Abstract deadline May 31st. * JPS meeting * Washimi * TTanaka * PEM maintenance * PEM List in Google spread sheet * PEM MAP webpage [[http://k1sum0/~controls/PEMmap/]] * Hardware part was completed, call for volunteer for check of the software part * SDF * PSL PEMs issue * We found one accelerometer(Kistler peri exit) temporary removed from the periscope. * We will return this week and ready for the engineer run(8th Jun.) * Also, we will place two portable accelerometer somewhere (near the main laser and rack??) * PEM injection(start the discussion) * Management of the sound injection (Large/Small speaker and placement, DAC, monitored PEM, ...) * Coil * Shaker * etc. * PEM injection flagを作る。(T田中) * English meeting * We will have a monthly English meeting(Mainly share the information with Virgo people) * First meeting will be held at 18th Jun.(Tue) 17:00-18:00 * 2nd Expand PEM meeting * preliminary agenda [[KAGRA/Subgroups/PEM/Meeting/190611/Agenda|wiki]] * each member progress * Washimi * PEM with Virgo : [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8991]] * Echo ringdownの解析をしている。 * GWADWで似たような発表をしている方がいた。 * 周波数のcutoffはなさそう、decayの周波数依存性はそんなになさそう。 * Facilityの空気の揺らぎとかが地下環境ではどうなのかを見るのが良い。 * X-end : Tomorrow I and Yokozawa-san will install * Accelerometers for P-cal (Tx, Rx) * Microphones for EXA and EXT booth * LIGO風PEM mapを作成した。 すごい * Summary pageの充実 * Power supply * Kozakai * 神岡で使えるようにした。 * Okutomi * Shaker injection * Miyo * Brief report of the GWADW * PEMはニュートニアン関連 * Future ground motion ealuation, especially around cryostat. * TTanaka * PEM with Virgo * Microphone calibration * Kaihotsu, Mori * Additional measurements * 排水、バキュームポンプ周り(20Hz?) * Yuzurihara * 新しいweb serverを立ち上げた。[[http://157.82.231.170/dailysummary/html/index.html ]] * etc * github progress |
Minute of PEM meeting
- Date: 2019/5/28 17:00-18:00(JST)
- Attendance: Yokozawa, Oshino, Miyo, TTanaka, Washimi, Kozakai, Yokozawa, Fujikawa, Mori, Kaihotsu, Yuzurihara, Yamat, Okutomi, Kokeyama
=== Agenda ===
- General issue
- Task list toward the O3
- Please send e-mail to me if you have comments.
- KIW6
Wohan, China URL
- Washimi, Kaihotsu
- Review/practice of the presentation at 18th. Jun 16:00- or 18:00-
- TAUP2019
Toyama, Japan URL
- Yokozawa, Miyo, (?)
- Abstract deadline May 31st.
- JPS meeting
- Washimi
- TTanaka
- PEM maintenance
- PEM List in Google spread sheet
PEM MAP webpage http://k1sum0/~controls/PEMmap/
- Hardware part was completed, call for volunteer for check of the software part
- SDF
- PSL PEMs issue
- We found one accelerometer(Kistler peri exit) temporary removed from the periscope.
- We will return this week and ready for the engineer run(8th Jun.)
- Also, we will place two portable accelerometer somewhere (near the main laser and rack??)
- PEM injection(start the discussion)
- Management of the sound injection (Large/Small speaker and placement, DAC, monitored PEM, ...)
- Coil
- Shaker
- etc.
- PEM injection flagを作る。(T田中)
- English meeting
- We will have a monthly English meeting(Mainly share the information with Virgo people)
- First meeting will be held at 18th Jun.(Tue) 17:00-18:00
- 2nd Expand PEM meeting
preliminary agenda wiki
- Task list toward the O3
- each member progress
- Washimi
PEM with Virgo : http://klog.icrr.u-tokyo.ac.jp/osl/?r=8991
- Echo ringdownの解析をしている。
- GWADWで似たような発表をしている方がいた。
- 周波数のcutoffはなさそう、decayの周波数依存性はそんなになさそう。
- Facilityの空気の揺らぎとかが地下環境ではどうなのかを見るのが良い。
- X-end : Tomorrow I and Yokozawa-san will install
- Accelerometers for P-cal (Tx, Rx)
- Microphones for EXA and EXT booth
- LIGO風PEM mapを作成した。 すごい
- Summary pageの充実
- Power supply
- Kozakai
- 神岡で使えるようにした。
- Okutomi
- Shaker injection
- Miyo
- Brief report of the GWADW
- PEMはニュートニアン関連
- Future ground motion ealuation, especially around cryostat.
- Brief report of the GWADW
- TTanaka
- PEM with Virgo
- Microphone calibration
- Kaihotsu, Mori
- Additional measurements
- 排水、バキュームポンプ周り(20Hz?)
- Yuzurihara
新しいweb serverを立ち上げた。[[http://157.82.231.170/dailysummary/html/index.html
- Washimi
]]
- etc
- github progress