Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2019-05-23 08:47:43
Size: 648
Comment:
Revision 3 as of 2019-05-23 08:48:23
Size: 668
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 * Virgo PEM tasks (Yokozawa, Washimi, TTanaka) (10min)  * Virgo PEM measurements (Yokozawa, Washimi, TTanaka) (10min)
Line 12: Line 12:
 * PSL simulation (TTanaka, Nakano) (10min)  * PSL noise budget/injection (TTanaka, Nakano) (10min)
Line 14: Line 14:
 * PEM injection (TTanaka)  * PEM injection1 (TTanaka)

Expand PEM meeting

  • 2019/6/11(火) 16:00-18:00
  • Expand meeting

=== Agenda ===

  • PEM status (Yokozawa) (10min)
  • Virgo PEM measurements (Yokozawa, Washimi, TTanaka) (10min)
  • Characterization of the EXC chamber (Washimi) (10min)
  • Power supply monitors (Washimi) (10min)
  • Acoustic and magnetic field measurement (Kaihotsu) (10min)
  • PSL noise budget/injection (TTanaka, Nakano) (10min)
  • Ground motion (Miyo)
  • PEM injection1 (TTanaka)
  • PEM injection2 shaker (Okutomi)
  • Kozapy (Kozakai)
  • Report from DetChar1 (Yamamoto) (10min)

  • Report from DetChar2 (Kokeyama) (10min)

  • Summary and future prospect (Yokozawa) (10min)

KAGRA/Subgroups/PEM/Meeting/190611/Agenda (last edited 2019-06-11 17:12:13 by yukino.mori)