Differences between revisions 2 and 13 (spanning 11 versions)
Revision 2 as of 2019-05-23 08:47:58
Size: 655
Comment:
Revision 13 as of 2019-06-11 15:27:23
Size: 847
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
 * Zoom2 : https://zoom.us/j/6676627462
Line 7: Line 8:
 * PEM status (Yokozawa) (10min)
 * Virgo PEM measurements (Yokozawa, Washimi, TTanaka) (10min)
 * PEM status (Yokozawa) (10min)  [[attachment:PEM_meeting_190611.pdf|pdf]]
 * Virgo PEM measurements (Yokozawa) (10min)[[attachment:PEM_meeting_190611.pdf|pdf]]
Line 12: Line 13:
 * PSL simulation (TTanaka, Nakano) (10min)
 * Ground motion (Miyo)
 * PEM injection (TTanaka)
 * PEM injection2 shaker (Okutomi)
 * Kozapy (Kozakai)
 * Report from DetChar1 (Yamamoto) (10min)
 * Report from DetChar2 (Kokeyama) (10min)
 * Current PEM measurements (Mori) (10min)
 * Ground motion (Miyo) (10min)
 * Sound injection (TTanaka) (10min)
 * PEM injection plan (TTanaka) (10min)
 * Kozapy+ (Kozakai) (20min) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10309|pdf]]
 * Report from DetChar (Yamamoto, Kokeyama) (10min)

Expand PEM meeting

=== Agenda ===

  • PEM status (Yokozawa) (10min) pdf

  • Virgo PEM measurements (Yokozawa) (10min)pdf

  • Characterization of the EXC chamber (Washimi) (10min)
  • Power supply monitors (Washimi) (10min)
  • Acoustic and magnetic field measurement (Kaihotsu) (10min)
  • Current PEM measurements (Mori) (10min)
  • Ground motion (Miyo) (10min)
  • Sound injection (TTanaka) (10min)
  • PEM injection plan (TTanaka) (10min)
  • Kozapy+ (Kozakai) (20min) pdf

  • Report from DetChar (Yamamoto, Kokeyama) (10min)

  • Summary and future prospect (Yokozawa) (10min)

KAGRA/Subgroups/PEM/Meeting/190611/Agenda (last edited 2019-06-11 17:12:13 by yukino.mori)