Differences between revisions 8 and 9
Revision 8 as of 2019-06-06 09:36:27
Size: 631
Comment:
Revision 9 as of 2019-06-08 18:31:01
Size: 675
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
 * Current PEM measurements (Mori) (10min)

Expand PEM meeting

=== Agenda ===

  • PEM status (Yokozawa) (10min)
  • Virgo PEM measurements (Yokozawa) (10min)
  • Characterization of the EXC chamber (Washimi) (10min)
  • Power supply monitors (Washimi) (10min)
  • Acoustic and magnetic field measurement (Kaihotsu) (10min)
  • Current PEM measurements (Mori) (10min)
  • Ground motion (Miyo) (10min)
  • Sound injection (TTanaka) (10min)
  • PEM injection plan (TTanaka) (10min)
  • Kozapy+ (Kozakai) (20min)
  • Report from DetChar (Yamamoto, Kokeyama) (10min)

  • Summary and future prospect (Yokozawa) (10min)

KAGRA/Subgroups/PEM/Meeting/190611/Agenda (last edited 2019-06-11 17:12:13 by yukino.mori)