Size: 1557
Comment:
|
Size: 1920
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 27: | Line 27: |
* Thunderstorm was detected by magnetometer * |
* Thunderstorm was detected by magnetometer, gorogoro * DC supply no significance difference before/after cooling * mag 1,3Hz appear * sound some line appear, but FFU was on. |
Line 30: | Line 32: |
* DC power monitor for the 18/24V * noise floor is limited by ADC noise * 60Hz was observed * 100Hz AC was quite dirty * Need the more safety AC monitor * We need to focus the power supply issue continuously |
|
Line 31: | Line 39: |
Minute of PEM meeting
- Date: 2019/6/11 16:00-18:00(JST)
- Attendance: Yokozawa, Washimi, Miyo, Kozakai, Oshino, Mori, Miyoki, Okawa, Fujikawa, TTanaka, Kaihotsu, Kokeyama
- Expand meeting
=== Agenda ===
- PEM status (Yokozawa) (10min)
- 2nd installation was almost finished, need the check of the chamber PEMs
- Virgo PEM measurements (Yokozawa) (10min)
- Sound decay measurement
- IYC chamber characterization
- Comparison between Virgo and KAGRA
- Characterization of the EXC chamber (Washimi) (10min)
- Why EXC? Removed the cryopayload and prepared ADC. Additional measurement by IYC
- FFU on/off
- Around 1Hz from cooler, 20.45, 30.62, 60.94, ... No problem to KAGRA sensitivity
- Evaluate the magnetic field by simulation after closing the chamber.
- Acoustic measurement, 13-59Hz and more than 1kHz from cooloer. (also, about 10kHz with 2Hz frequency)
- Coherence observed from only the fan
- 2Hz did not appear at the chamber accelerometer
- X-end PEM models
- Before/After cooling down
- 0.5 deg increasing by the ondotori
- Thunderstorm was detected by magnetometer, gorogoro
- DC supply no significance difference before/after cooling
- mag 1,3Hz appear
- sound some line appear, but FFU was on.
- Power supply monitors (Washimi) (10min)
- DC power monitor for the 18/24V
- noise floor is limited by ADC noise
- 60Hz was observed
- 100Hz AC was quite dirty
- Need the more safety AC monitor
- We need to focus the power supply issue continuously
- Acoustic and magnetic field measurement (Kaihotsu) (10min)
- Current PEM measurements (Mori) (10min)
- Ground motion (Miyo) (10min)
- Sound injection (TTanaka) (10min)
- PEM injection plan (TTanaka) (10min)
- Kozapy+ (Kozakai) (20min)
Report from DetChar (Yamamoto, Kokeyama) (10min)
- Summary and future prospect (Yokozawa) (10min)