Differences between revisions 1 and 8 (spanning 7 versions)
Revision 1 as of 2019-06-01 19:54:10
Size: 194
Comment:
Revision 8 as of 2019-06-18 15:33:45
Size: 612
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:

 * General issue(Yokozawa)
 * Summary of the KAGRA PEM activities at this one month (Yokozawa) [[attachment:PEM_meeting_190611.pdf|pdf]]
 * Brief introduction of the Virgo-KAGRA PEM measurement at May (Yokozawa, Washimi)
 * Each member report
  * update of reverberation time in KAGRA (Washimi)
  * Report from Virgo (Federico, Irene)
  * Long term seismometer signal (Irene)
 * Future prospect discussion

Weekly PEM meeting

  • 2019/6/18(Tue) 17:00-(JST) 10:00-(CEST)
  • Monthly English meeting meeting
  • Web meeting with Zoom2 (Zoom2)

=== Agenda ===

  • General issue(Yokozawa)
  • Summary of the KAGRA PEM activities at this one month (Yokozawa) pdf

  • Brief introduction of the Virgo-KAGRA PEM measurement at May (Yokozawa, Washimi)
  • Each member report
    • update of reverberation time in KAGRA (Washimi)
    • Report from Virgo (Federico, Irene)
    • Long term seismometer signal (Irene)
  • Future prospect discussion

KAGRA/Subgroups/PEM/Meeting/190618/Agenda (last edited 2019-06-18 17:30:38 by tatsuki.washimi)