Size: 498
Comment:
|
← Revision 10 as of 2019-06-18 17:30:38 ⇥
Size: 691
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 9: | Line 9: |
* Summary of the KAGRA PEM activities at this one month (Yokozawa) | * Summary of the KAGRA PEM activities at this one month (Yokozawa) [[attachment:PEM_meeting_190611.pdf|pdf]] |
Line 12: | Line 12: |
* update of reverberation time in KAGRA (Washimi) * * |
* update of reverberation time in KAGRA (Washimi)[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=10353|pdf]] * Report from Virgo (Federico, Irene) * Long term seismometer signal (Irene) |
Weekly PEM meeting
- 2019/6/18(Tue) 17:00-(JST) 10:00-(CEST)
- Monthly English meeting meeting
Web meeting with Zoom2 (Zoom2)
=== Agenda ===
- General issue(Yokozawa)
Summary of the KAGRA PEM activities at this one month (Yokozawa) pdf
- Brief introduction of the Virgo-KAGRA PEM measurement at May (Yokozawa, Washimi)
- Each member report
update of reverberation time in KAGRA (Washimi)pdf
- Report from Virgo (Federico, Irene)
- Long term seismometer signal (Irene)
- Future prospect discussion