Differences between revisions 3 and 4
Revision 3 as of 2019-06-18 17:01:24
Size: 597
Comment:
Revision 4 as of 2019-06-18 17:09:18
Size: 702
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * Attendance: Yokozawa, Washimi, Federico, TTanaka, Irene, Kozakai, Okawa, Fujikawa, Mori  * Attendance: Yokozawa, Washimi, Federico, TTanaka, Irene, Kozakai, Okawa, Fujikawa, Mori, Miyo, Yuzu, Jishnu
Line 11: Line 11:
  * Yuzu and Jishnu at Kamioka for updating summary pages
  * Commissioning report

Minute of PEM meeting


  • Date: 2019/6/18 17:00-18:00(JST) 10:00-11:00(CEST)
  • Attendance: Yokozawa, Washimi, Federico, TTanaka, Irene, Kozakai, Okawa, Fujikawa, Mori, Miyo, Yuzu, Jishnu
  • English meeting

=== Agenda ===

  • General issue(Yokozawa)
    • Yuzu and Jishnu at Kamioka for updating summary pages
    • Commissioning report
  • Summary of the KAGRA PEM activities at this one month (Yokozawa)
  • Brief introduction of the Virgo-KAGRA PEM measurement at May (Yokozawa, Washimi)
  • Each member report
    • update of reverberation time in KAGRA (Washimi)
    • Report from Virgo (Federico, Irene)
    • Long term seismometer signal (Irene)
  • Future prospect discussion

KAGRA/Subgroups/PEM/Meeting/190618/Minute (last edited 2019-06-18 17:22:37 by TakaakiYokozawa)