Differences between revisions 3 and 5 (spanning 2 versions)
Revision 3 as of 2019-06-18 17:01:24
Size: 597
Comment:
Revision 5 as of 2019-06-18 17:22:37
Size: 1156
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * Attendance: Yokozawa, Washimi, Federico, TTanaka, Irene, Kozakai, Okawa, Fujikawa, Mori  * Attendance: Yokozawa, Washimi, Federico, TTanaka, Irene, Kozakai, Okawa, Fujikawa, Mori, Miyo, Yuzu, Jishnu, Kokeyama, Kaihotsu
Line 11: Line 11:
  * Yuzu and Jishnu at Kamioka for updating summary pages
  * Commissioning report
Line 15: Line 17:
  * Report from Virgo (Federico, Irene)   * We introduced the now sound injection source, starter (Very nice!)
  * The SNR is very good.
  * 5% error give by hand
  * Fitting the RT60 value
  * showed the time dependence of the RT60, the peak frequency was different from Virgo's one
  * Measured at both XYend station
  * We didn't understand the structure of the spectral
  * RT60 is 1s order, that is good result
 * Report from Virgo (Federico, Irene)
  * Investigation of the Magnetic field injection

Minute of PEM meeting


  • Date: 2019/6/18 17:00-18:00(JST) 10:00-11:00(CEST)
  • Attendance: Yokozawa, Washimi, Federico, TTanaka, Irene, Kozakai, Okawa, Fujikawa, Mori, Miyo, Yuzu, Jishnu, Kokeyama, Kaihotsu
  • English meeting

=== Agenda ===

  • General issue(Yokozawa)
    • Yuzu and Jishnu at Kamioka for updating summary pages
    • Commissioning report
  • Summary of the KAGRA PEM activities at this one month (Yokozawa)
  • Brief introduction of the Virgo-KAGRA PEM measurement at May (Yokozawa, Washimi)
  • Each member report
    • update of reverberation time in KAGRA (Washimi)
    • We introduced the now sound injection source, starter (Very nice!)
    • The SNR is very good.
    • 5% error give by hand
    • Fitting the RT60 value
    • showed the time dependence of the RT60, the peak frequency was different from Virgo's one
    • Measured at both XYend station
    • We didn't understand the structure of the spectral
    • RT60 is 1s order, that is good result
  • Report from Virgo (Federico, Irene)
    • Investigation of the Magnetic field injection
    • Long term seismometer signal (Irene)
  • Future prospect discussion

KAGRA/Subgroups/PEM/Meeting/190618/Minute (last edited 2019-06-18 17:22:37 by TakaakiYokozawa)