== Weekly PEM meeting == * 2019/6/25(Tue) 17:00-(JST) * Regular meeting meeting * Web meeting with Zoom2 ([[https://zoom.us/j/6676627462|Zoom2]]) === Agenda === * General issue * Installation of the 1st PEM toward the O3 was (almost) completed!! * Center area, X end, Y end, weather station * Remaining : Magnetometer!!! * 2nd PEM installation will be started after the characterization of the chambers. (After O3??) * Washimi PEM webpage [[https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/PEM/PEMmap/|URL]] * PEM map provided by the medm was updated. * The power supply status measurements will be (re-)start soon * With the discussion with the Facility * Task list toward the O3 * [[https://docs.google.com/spreadsheets/d/1DSltWg18KrwnfkVJmSm09TkQ82aQ5lHAdaC9uCozGC0/edit#gid=1072504162|task sheet]] * Please send e-mail to me if you have comments. * Engineering run * 1st engineering run : Jun. 8th 12:00-18:00(JST) : Xarm cavity * What should we do toward the next engineering run * KIW6 * Washimi-san and Kaihotsu-san presented * Currently, I heard that PEM activity is great! This is good news. * English meeting * We will have a monthly English meeting(Mainly share the information with Virgo people) * The third Tuesday of every month 17:00-(JST) 10:00-(CEST) * 2nd meeting will be held at 16th Jul.(Tue) 17:00-18:00 [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/190716/Agenda|URL]] * Seismon issue * We already installed to KAGRA system * Need the tuning for the KAGRA * Large earthquake happened this month, we "should" be a safe mode before coming large earthquake (PEM issue???) * Yuzu summary page was upgraded! * There will be a report in the each member progress * One student (Yikang) will come to KAGRA and work with PEM group * Last his visiting was cryo issue * Magnetometer and shaker injection (?) * each member progress * Yokozawa * Coherent analysis during the engineering run * Washimi  * New accelerometer * plan for cryochamber characterization * other * Kozakai * Trigger rate analysis during engineering run * Collaboration with Yuzu summary page * Miyo * Effect the protect shied to the seismometer * Long term study of the KAGRA ground motion * Oshino * Weather station issue * TTanaka(may not attend this meeting) * Preparing for the PEM injection [[attachment:Meeting190625.pdf|pdf]] * Microphone calibration * Okutomi * Shaker injection * Kaihotsu * Report about the KIW6 * Yuzurihara * Yuzu summary page * etc * github progress