Differences between revisions 1 and 7 (spanning 6 versions)
Revision 1 as of 2019-06-25 17:03:12
Size: 231
Comment:
Revision 7 as of 2019-06-26 12:38:02
Size: 4248
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
 * Date: 2019/5/28 17:00-18:00(JST)
 * Attendance: Yokozawa, Oshino, Miyo, TTanaka, Washimi, Kozakai, Yokozawa, Fujikawa, Mori, Kaihotsu, Yuzurihara, Yamat, Okutomi, Kokeyama
 * Date: 2019/6/25 17:00-18:00(JST)
 * Attendance: Yokozawa, Kozakai, Mori, TTanaka, Kaihotsu, Somiya, Okawa, Fujikawa, Washimi, Oshino
Line 8: Line 8:

 * General issue
  * Installation of the 1st PEM toward the O3 was (almost) completed!!
   * Center area, X end, Y end, weather station
   * Remaining : Magnetometer!!!
   * 2nd PEM installation will be started after the characterization of the chambers. (After O3??)
   * Washimi PEM webpage [[https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/PEM/PEMmap/|URL]]
   * PEM map provided by the medm was updated.
  * The power supply status measurements will be (re-)start soon
   * With the discussion with the Facility
  * Task list toward the O3
   * [[https://docs.google.com/spreadsheets/d/1DSltWg18KrwnfkVJmSm09TkQ82aQ5lHAdaC9uCozGC0/edit#gid=1072504162|task sheet]]
   * Please send e-mail to me if you have comments.
  * Engineering run
   * 1st engineering run : Jun. 8th 12:00-18:00(JST) : Xarm cavity
   * What should we do toward the next engineering run
  * KIW6
   * Washimi-san and Kaihotsu-san presented
   * Currently, I heard that PEM activity is great! This is good news.
  * English meeting
   * We will have a monthly English meeting(Mainly share the information with Virgo people)
   * The third Tuesday of every month 17:00-(JST) 10:00-(CEST)
   * 2nd meeting will be held at 16th Jul.(Tue) 17:00-18:00 [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/190716/Agenda|URL]]
  * Seismon issue
   * We already installed to KAGRA system
   * Need the tuning for the KAGRA
   * Large earthquake happened this month, we "should" be a safe mode before coming large earthquake (PEM issue???)
  * Yuzu summary page was upgraded!
   * There will be a report in the each member progress
  * One student (Yikang) will come to KAGRA and work with PEM group
   * Last his visiting was cryo issue
   * Magnetometer and shaker injection (?)


 * each member progress
  * Yokozawa
   * Coherent analysis during the engineering run
   * Bruco analysis
   * Origin of the vibration
  * Washimi 
   * KIW6 report
    * Status talk
    * Importance of the PEM injection
    * Suspect of the magnetic field requirement -> 勾配のほうだった
    * LIGOで静電場が問題になってきている。ポンプからの鉄カスなどが影響するかもしれない、caltechのabbottさんなど
   * New accelerometer
    * USB output accelerometer will be arrived at KAGRA (6/26)
    * Check the signal soon
   * plan for cryochamber characterization
    * Summary to the paper at August
    * Scheduling
   * Thunderbolt issue
    * Thunderbolt generated the magnetic field and observed by the magnetometer
    * No monitor tool in the weather station
  * Kozakai
   * Trigger rate analysis during engineering run
    * 6 segments with long lock
    * Trigger time
    * IMC PC was replaced before the engineering run -> IMC trigger 1min
    * Accelerometer trigger rate was not so changed between fan on and off.
    * No large SNR glitch for the important channel
    * Time different between previous trigger
     * random case : clean explanation plot
   * Collaboration with Yuzu summary page
    * Generate the help slide
  * Miyo
   * Effect the protect shied to the seismometer
   * Long term study of the KAGRA ground motion, [[https://github.com/MiyoKouseki/kagra-gif/issues/89|Link]]
    * select 300 1h data from February
    * categorize good or bad
    * Bad is earthquake, daq troble , ...
    * 5% - 95%の範囲を示した。
    * 2-6月の静かな時、世界基準のLow modelと近い感じ
    * 関口さん@clio site : Lowとhighの間に位置している。
    * 月ごと、時間ごと
    * BLRMSの時間変化
    * 気象との相関、波や低気圧やいろいろ
  * Oshino
   * Weather station issue
  * TTanaka(may not attend this meeting)
   * Preparing for the PEM injection [[attachment:meeting190625.pdf|pdf]]
   * Microphone calibration
  * Okutomi
   * Shaker injection
  * Kaihotsu
   * Report about the KIW6
  * Yuzurihara
   * Yuzu summary page
  * etc

 * github progress

Minute of PEM meeting


  • Date: 2019/6/25 17:00-18:00(JST)
  • Attendance: Yokozawa, Kozakai, Mori, TTanaka, Kaihotsu, Somiya, Okawa, Fujikawa, Washimi, Oshino

=== Agenda ===

  • General issue
    • Installation of the 1st PEM toward the O3 was (almost) completed!!
      • Center area, X end, Y end, weather station
      • Remaining : Magnetometer!!!
      • 2nd PEM installation will be started after the characterization of the chambers. (After O3??)
      • Washimi PEM webpage URL

      • PEM map provided by the medm was updated.
    • The power supply status measurements will be (re-)start soon
      • With the discussion with the Facility
    • Task list toward the O3
      • task sheet

      • Please send e-mail to me if you have comments.
    • Engineering run
      • 1st engineering run : Jun. 8th 12:00-18:00(JST) : Xarm cavity
      • What should we do toward the next engineering run
    • KIW6
      • Washimi-san and Kaihotsu-san presented
      • Currently, I heard that PEM activity is great! This is good news.
    • English meeting
      • We will have a monthly English meeting(Mainly share the information with Virgo people)
      • The third Tuesday of every month 17:00-(JST) 10:00-(CEST)
      • 2nd meeting will be held at 16th Jul.(Tue) 17:00-18:00 URL

    • Seismon issue
      • We already installed to KAGRA system
      • Need the tuning for the KAGRA
      • Large earthquake happened this month, we "should" be a safe mode before coming large earthquake (PEM issue???)
    • Yuzu summary page was upgraded!
      • There will be a report in the each member progress
    • One student (Yikang) will come to KAGRA and work with PEM group
      • Last his visiting was cryo issue
      • Magnetometer and shaker injection (?)
  • each member progress
    • Yokozawa
      • Coherent analysis during the engineering run
      • Bruco analysis
      • Origin of the vibration
    • Washimi 
      • KIW6 report
        • Status talk
        • Importance of the PEM injection
        • Suspect of the magnetic field requirement -> 勾配のほうだった

        • LIGOで静電場が問題になってきている。ポンプからの鉄カスなどが影響するかもしれない、caltechのabbottさんなど
      • New accelerometer
        • USB output accelerometer will be arrived at KAGRA (6/26)
        • Check the signal soon
      • plan for cryochamber characterization
        • Summary to the paper at August
        • Scheduling
      • Thunderbolt issue
        • Thunderbolt generated the magnetic field and observed by the magnetometer
        • No monitor tool in the weather station
    • Kozakai
      • Trigger rate analysis during engineering run
        • 6 segments with long lock
        • Trigger time
        • IMC PC was replaced before the engineering run -> IMC trigger 1min

        • Accelerometer trigger rate was not so changed between fan on and off.
        • No large SNR glitch for the important channel
        • Time different between previous trigger
          • random case : clean explanation plot
      • Collaboration with Yuzu summary page
        • Generate the help slide
    • Miyo
      • Effect the protect shied to the seismometer
      • Long term study of the KAGRA ground motion, Link

        • select 300 1h data from February
        • categorize good or bad
        • Bad is earthquake, daq troble , ...
        • 5% - 95%の範囲を示した。
        • 2-6月の静かな時、世界基準のLow modelと近い感じ
        • 関口さん@clio site : Lowとhighの間に位置している。
        • 月ごと、時間ごと
        • BLRMSの時間変化
        • 気象との相関、波や低気圧やいろいろ
    • Oshino
      • Weather station issue
    • TTanaka(may not attend this meeting)
      • Preparing for the PEM injection pdf

      • Microphone calibration
    • Okutomi
      • Shaker injection
    • Kaihotsu
      • Report about the KIW6
    • Yuzurihara
      • Yuzu summary page
    • etc
  • github progress

KAGRA/Subgroups/PEM/Meeting/190625/Minute (last edited 2019-06-26 12:38:02 by tatsuki.washimi)