Size: 959
Comment:
|
Size: 3056
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 9: | Line 9: |
* To be appear soon! | * KAGRA interferometer status * PRC loss was large, birefringence effect? * FPMI or SRFPMI or DRFPMI * Open the CS area and remove the PRM and SRM? * Before that, we want to investigate the scattering effect at CS area * Chrome Book project * Portable PEM researcher * Spectral analyzer, sound recording, ... * USB accelerometer, microphone, ... * Data sharing [[https://drive.google.com/open?id=1zIturCCaSe7mmP0s15TcRzHsvNvomP5k|GoogleDrive]] * Weekly PEM measurement * Friday is temporal weekly PEM measurement * Understanding the effect of the instruments and so on * Power supply * duct vibration * PEM DAQ sampling rate * Due to the limited DAQ power, almost all PEMs are taken at 2kHz sampling * Only PSL and CS microphone are taken with 16kHz sampling for the noise hunting * PEM injection * Shaker injection1 (Yikang, Yokozawa) * Shaker injection2 (Okutomi, Fabian) * acoustic injection (TTanaka) * magnetic field injection (Yikang, Yokozawa) * RF injection (TTanaka, Washimi) * 1st engineering run * 1st engineering run : Jun. 8th 12:00-18:00(JST) : Xarm cavity * Preparing toward the next engineering run * Next engineering run : 13th Jul. * Interferometer configuration ? * English meeting * We will have a monthly English meeting(Mainly share the information with Virgo people) * The third Tuesday of every month 17:00-(JST) 10:00-(CEST) * 2nd meeting will be held at 16th Jul.(Tue) 17:00-18:00 [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/190716/Agenda|URL]] * Seismon issue * We already installed to KAGRA system * Need the tuning for the KAGRA * Large earthquake happened this month, we "should" be a safe mode before coming large earthquake (PEM issue???) * Task list toward the O3 * [[https://docs.google.com/spreadsheets/d/1DSltWg18KrwnfkVJmSm09TkQ82aQ5lHAdaC9uCozGC0/edit#gid=1072504162|task sheet]] * Please send e-mail to me if you have comments. |
Line 13: | Line 61: |
* Coherent analysis during the engineering run | * Power supply issue |
Line 15: | Line 63: |
* New accelerometer * plan for cryochamber characterization * other |
* Plan for cryochamber characterization * Sound reverberation analysis * Kaminari monitoring * Others and plan toward the JPS meeting |
Line 19: | Line 68: |
* Trigger rate analysis during engineering run * Collaboration with Yuzu summary page |
* Trigger event identification * Yuzu summary page comments * Others and plan toward the JPS meeting |
Line 26: | Line 76: |
* TTanaka(may not attend this meeting) * Preparing for the PEM injection [[attachment:meeting190625.pdf|pdf]] |
* TTanaka * Preparing for the PEM injection |
Line 29: | Line 79: |
* Thesis agenda and plan toward the JPS meeting | |
Line 34: | Line 85: |
* Yuzu summary page | * Yuzu summary page comments |
Weekly PEM meeting
- 2019/7/02(Tue) 17:00-(JST)
- Regular meeting meeting
Web meeting with Zoom2 (Zoom2)
=== Agenda ===
- General issue
- KAGRA interferometer status
- PRC loss was large, birefringence effect?
- FPMI or SRFPMI or DRFPMI
- Open the CS area and remove the PRM and SRM?
- Before that, we want to investigate the scattering effect at CS area
- Chrome Book project
- Portable PEM researcher
- Spectral analyzer, sound recording, ...
- USB accelerometer, microphone, ...
Data sharing GoogleDrive
- Weekly PEM measurement
- Friday is temporal weekly PEM measurement
- Understanding the effect of the instruments and so on
- Power supply
- duct vibration
- PEM DAQ sampling rate
- Due to the limited DAQ power, almost all PEMs are taken at 2kHz sampling
- Only PSL and CS microphone are taken with 16kHz sampling for the noise hunting
- PEM injection
- Shaker injection1 (Yikang, Yokozawa)
- Shaker injection2 (Okutomi, Fabian)
- acoustic injection (TTanaka)
- magnetic field injection (Yikang, Yokozawa)
- RF injection (TTanaka, Washimi)
- 1st engineering run
- 1st engineering run : Jun. 8th 12:00-18:00(JST) : Xarm cavity
- Preparing toward the next engineering run
- Next engineering run : 13th Jul.
- Interferometer configuration ?
- English meeting
- We will have a monthly English meeting(Mainly share the information with Virgo people)
- The third Tuesday of every month 17:00-(JST) 10:00-(CEST)
2nd meeting will be held at 16th Jul.(Tue) 17:00-18:00 URL
- Seismon issue
- We already installed to KAGRA system
- Need the tuning for the KAGRA
- Large earthquake happened this month, we "should" be a safe mode before coming large earthquake (PEM issue???)
- Task list toward the O3
- Please send e-mail to me if you have comments.
- KAGRA interferometer status
- each member progress
- Yokozawa
- Power supply issue
- Washimi
- Plan for cryochamber characterization
- Sound reverberation analysis
- Kaminari monitoring
- Others and plan toward the JPS meeting
- Kozakai
- Trigger event identification
- Yuzu summary page comments
- Others and plan toward the JPS meeting
- Miyo
- Effect the protect shied to the seismometer
- Long term study of the KAGRA ground motion
- Oshino
- Weather station issue
- TTanaka
- Preparing for the PEM injection
- Microphone calibration
- Thesis agenda and plan toward the JPS meeting
- Okutomi
- Shaker injection
- Kaihotsu
- Report about the KIW6
- Yuzurihara
- Yuzu summary page comments
- etc
- Yokozawa
- github progress