Differences between revisions 1 and 8 (spanning 7 versions)
Revision 1 as of 2019-06-26 12:16:57
Size: 959
Comment:
Revision 8 as of 2019-07-02 07:16:23
Size: 1369
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
  * To be appear soon!
  * KAGRA interferometer status

  * Google chrome project

  * Weekly PEM measurement

  * PEM DAQ sampling rate

  * PEM injection

  * Preparing toward the next engineering run

  * Task list toward the O3
   * [[https://docs.google.com/spreadsheets/d/1DSltWg18KrwnfkVJmSm09TkQ82aQ5lHAdaC9uCozGC0/edit#gid=1072504162|task sheet]]
   * Please send e-mail to me if you have comments.
Line 13: Line 28:
   * Coherent analysis during the engineering run    * Power supply issue
Line 15: Line 30:
   * New accelerometer
   * p
lan for cryochamber characterization
   * other
   * Plan for cryochamber characterization
   * Sound reverberation analysis
   * O
thers and plan toward the JPS meeting
Line 19: Line 34:
   * Trigger rate analysis during engineering run
   * Collaboration with Yuzu summary page
   * Trigger event identification
   * Yuzu summary page comments
   * Others and plan toward the JPS meeting
Line 26: Line 42:
  * TTanaka(may not attend this meeting)
   * Preparing for the PEM injection  [[attachment:meeting190625.pdf|pdf]]
  * TTanaka
   * Preparing for the PEM injection
Line 29: Line 45:
   * Thesis agenda and plan toward the JPS meeting
Line 34: Line 51:
   * Yuzu summary page    * Yuzu summary page comments

Weekly PEM meeting

  • 2019/7/02(Tue) 17:00-(JST)
  • Regular meeting meeting
  • Web meeting with Zoom2 (Zoom2)

=== Agenda ===

  • General issue
    • KAGRA interferometer status
    • Google chrome project
    • Weekly PEM measurement
    • PEM DAQ sampling rate
    • PEM injection
    • Preparing toward the next engineering run
    • Task list toward the O3
      • task sheet

      • Please send e-mail to me if you have comments.
  • each member progress
    • Yokozawa
      • Power supply issue
    • Washimi 
      • Plan for cryochamber characterization
      • Sound reverberation analysis
      • Others and plan toward the JPS meeting
    • Kozakai
      • Trigger event identification
      • Yuzu summary page comments
      • Others and plan toward the JPS meeting
    • Miyo
      • Effect the protect shied to the seismometer
      • Long term study of the KAGRA ground motion
    • Oshino
      • Weather station issue
    • TTanaka
      • Preparing for the PEM injection
      • Microphone calibration
      • Thesis agenda and plan toward the JPS meeting
    • Okutomi
      • Shaker injection
    • Kaihotsu
      • Report about the KIW6
    • Yuzurihara
      • Yuzu summary page comments
    • etc
  • github progress

KAGRA/Subgroups/PEM/Meeting/190702/Agenda (last edited 2019-07-02 17:46:06 by taiki.tanaka)