Differences between revisions 4 and 7 (spanning 3 versions)
Revision 4 as of 2019-07-02 07:14:01
Size: 1024
Comment:
Revision 7 as of 2019-07-02 07:15:33
Size: 1191
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:

  * KAGRA interferometer status
Line 12: Line 15:

  * PEM DAQ sampling rate

  * PEM injection

  * Preparing toward the next engineering run

  * Tasks toward the O3 run

Weekly PEM meeting

  • 2019/7/02(Tue) 17:00-(JST)
  • Regular meeting meeting
  • Web meeting with Zoom2 (Zoom2)

=== Agenda ===

  • General issue
    • KAGRA interferometer status
    • Google chrome project
    • Weekly PEM measurement
    • PEM DAQ sampling rate
    • PEM injection
    • Preparing toward the next engineering run
    • Tasks toward the O3 run
  • each member progress
    • Yokozawa
      • Power supply issue
    • Washimi 
      • Plan for cryochamber characterization
      • Sound reverberation analysis
      • Others and plan toward the JPS meeting
    • Kozakai
      • Trigger event identification
      • Yuzu summary page comments
      • Others and plan toward the JPS meeting
    • Miyo
      • Effect the protect shied to the seismometer
      • Long term study of the KAGRA ground motion
    • Oshino
      • Weather station issue
    • TTanaka
      • Preparing for the PEM injection
      • Microphone calibration
      • Thesis agenda and plan toward the JPS meeting
    • Okutomi
      • Shaker injection
    • Kaihotsu
      • Report about the KIW6
    • Yuzurihara
      • Yuzu summary page comments
    • etc
  • github progress

KAGRA/Subgroups/PEM/Meeting/190702/Agenda (last edited 2019-07-02 17:46:06 by taiki.tanaka)