Differences between revisions 7 and 9 (spanning 2 versions)
Revision 7 as of 2019-07-02 07:15:33
Size: 1191
Comment:
Revision 9 as of 2019-07-02 08:20:50
Size: 2288
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
   * PRC loss was large, birefringence effect?
   * FPMI or SRFPMI or DRFPMI
   * Open the CS area and remove the PRM and SRM?
   * Before that, we want to investigate the scattering effect at CS area
Line 13: Line 17:
   * Portable PEM researcher
   * Spectral analyzer, sound recording, ...
   * USB accelerometer, microphone, ...
Line 15: Line 22:
   * Friday is temporal weekly PEM measurement
   * Understanding the effect of the instruments and so on
   * Power supply
   * duct vibration
Line 17: Line 28:
   * Due to the limited DAQ power, almost all PEMs are taken at 2kHz sampling
   * Only PSL and CS microphone are taken with 16kHz sampling for the noise hunting
Line 19: Line 32:
   * Shaker injection1 (Yikang, Yokozawa)
   * Shaker injection2 (Okutomi, Fabian)
   * acoustic injection (TTanaka)
   * magnetic field injection (Yikang, Yokozawa)
   * RF injection (TTanaka, Washimi)
Line 21: Line 39:
   * Next engineering run : 13th Jul.
   * Interferometer configuration ?
Line 22: Line 42:
  * Tasks toward the O3 run   * Task list toward the O3
   * [[https://docs.google.com/spreadsheets/d/1DSltWg18KrwnfkVJmSm09TkQ82aQ5lHAdaC9uCozGC0/edit#gid=1072504162|task sheet]]
   * Please send e-mail to me if you have comments.

Weekly PEM meeting

  • 2019/7/02(Tue) 17:00-(JST)
  • Regular meeting meeting
  • Web meeting with Zoom2 (Zoom2)

=== Agenda ===

  • General issue
    • KAGRA interferometer status
      • PRC loss was large, birefringence effect?
      • FPMI or SRFPMI or DRFPMI
      • Open the CS area and remove the PRM and SRM?
      • Before that, we want to investigate the scattering effect at CS area
    • Google chrome project
      • Portable PEM researcher
      • Spectral analyzer, sound recording, ...
      • USB accelerometer, microphone, ...
    • Weekly PEM measurement
      • Friday is temporal weekly PEM measurement
      • Understanding the effect of the instruments and so on
      • Power supply
      • duct vibration
    • PEM DAQ sampling rate
      • Due to the limited DAQ power, almost all PEMs are taken at 2kHz sampling
      • Only PSL and CS microphone are taken with 16kHz sampling for the noise hunting
    • PEM injection
      • Shaker injection1 (Yikang, Yokozawa)
      • Shaker injection2 (Okutomi, Fabian)
      • acoustic injection (TTanaka)
      • magnetic field injection (Yikang, Yokozawa)
      • RF injection (TTanaka, Washimi)
    • Preparing toward the next engineering run
      • Next engineering run : 13th Jul.
      • Interferometer configuration ?
    • Task list toward the O3
      • task sheet

      • Please send e-mail to me if you have comments.
  • each member progress
    • Yokozawa
      • Power supply issue
    • Washimi 
      • Plan for cryochamber characterization
      • Sound reverberation analysis
      • Others and plan toward the JPS meeting
    • Kozakai
      • Trigger event identification
      • Yuzu summary page comments
      • Others and plan toward the JPS meeting
    • Miyo
      • Effect the protect shied to the seismometer
      • Long term study of the KAGRA ground motion
    • Oshino
      • Weather station issue
    • TTanaka
      • Preparing for the PEM injection
      • Microphone calibration
      • Thesis agenda and plan toward the JPS meeting
    • Okutomi
      • Shaker injection
    • Kaihotsu
      • Report about the KIW6
    • Yuzurihara
      • Yuzu summary page comments
    • etc
  • github progress

KAGRA/Subgroups/PEM/Meeting/190702/Agenda (last edited 2019-07-02 17:46:06 by taiki.tanaka)